Laserfiche WebLink
streets, topography, building foot prints (including set -back to proposed right - <br />of -way lines), parcel numbers, addresses, indication of full or partial take of <br />each property and amount of right -of -way needed per parcel for each <br />alternative. The Consultant shall identify in detail any loss of on -site parking <br />for each parcel affected by the PROJECT. The Consultant shall submit the <br />right -of -way map to the City and participating agencies for review and <br />approval. Final maps shall be delivered on mylar and electronically as both <br />.PDF and .DGN files. All electronic files related to the right -of -way maps shall <br />become property of the City. <br />Following approval of the right -of -way map, the Consultant shall prepare a <br />cost estimate for acquiring right -of -way. The Consultant shall provide <br />sufficient information to the City to facilitate the preparation of cost estimates <br />for land acquisition, structure demolition, relocation, administration and other <br />miscellaneous costs. The Consultant shall identify the public improvements <br />cost per parcel for the purpose of right -of -way dedication in exchange for <br />public improvements for all partial takes. The Consultant shall utilize a <br />California licensed land surveyor to prepare legal descriptions and exhibits for <br />all partial and full takes as well as a plan for the reuse of remnant parcels of <br />the partial takes. <br />Deliverables — Right -of -Way survey. <br />M. Cost Estimates <br />The Consultant shall prepare a cost estimate for final design, shoofly, <br />permitting, right -of -way acquisition, TMP, construction, utilities relocation, and <br />potential mitigation measures. The construction estimate shall include details <br />of estimated quantities and unit costs for major items of work based on <br />current prices. The Consultant shall verify current prices with manufacturers, <br />material suppliers and contractors. The cost estimates shall be prepared for <br />each alternative and submitted at each milestone along with the conceptual <br />engineering plans. <br />Deliverables —Cost Estimates. <br />N. Environmental Evaluation <br />The Consultant shall prepare the environmental evaluation documents for the <br />PROJECT in accordance with CEQA and NEPA guidelines. The procedures <br />shall include the City of Santa Ana adopted environmental rules for the <br />implementation of CEQA and NEPA. The Consultant shall prepare the <br />Preliminary Environmental Analysis Report (PEAR) in accordance to Caltrans <br />PEAR Handbook to comply with the requirement of the PSRE. <br />12 <br />