My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25B - SANTA ANA BLVD GRADE SEPARATION_ Exhibit A_Color
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2011
>
01/18/2011
>
25B - SANTA ANA BLVD GRADE SEPARATION_ Exhibit A_Color
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/26/2016 2:35:02 PM
Creation date
1/3/2011 12:58:03 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Item #
25G
Date
1/4/2011
Destruction Year
2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
52
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The environmental analysis and documentation activities required by the <br />CEQA and NEPA shall include, but not be limited to, the following specific <br />requirements: <br />1. The Consultant shall research and review previous studies and <br />environmental documentation applicable to the PROJECT. The <br />Consultant shall prepare a technical memorandum summarizing the <br />review of pertinent documents. <br />2. The Consultant shall submit five (5) copies and participant agencies' <br />required number of copies of the environmental evaluation documents <br />plus electronic files for City and participant agencies to review. After <br />the review, the Consultant shall incorporate revisions to the document <br />and submit the required number of revised copies plus electronic files <br />for review and approval. The Consultant shall be responsible for re- <br />submittals until all City and participant agencies' comments have been <br />addressed to the satisfaction of all stakeholders. <br />Deliverables — Environmental Checklist , PEAR and ISA. <br />O. PSRE Submittal <br />The Consultant shall submit ten (10) copies of the Draft PSRE plus electronic <br />files for review and comment. The Consultant shall also provide a sufficient <br />number of copies for all stakeholders. In addition of the requirements of <br />Caltrans' PSRE, the Consultant shall analyze, describe, and evaluate all <br />potential environmental impacts of the proposed PROJECT, provide any <br />necessary and available mitigation measure, and compare the relative <br />impacts for each alternative and indicate the level of impacts after mitigation. <br />After the review, the Consultant shall incorporate revisions to the document <br />and submit the required number (same number as Draft PSRE) of Final <br />PSRE plus electronic files for review and approval. The Consultant shall be <br />responsible for re- submittals until all City and participant agencies' comments <br />have been addressed <br />The Consultant shall draft the Resolution of Certification with the required <br />findings. The City Council will review and approve the Draft Resolution and <br />City staff will prepare the Final Resolution. <br />Deliverables — Draft and Final PSRE. <br />P. Submittal Format At Completion <br />The Consultant shall maintain PROJECT files using the City's specified filing <br />system. The Consultant shall be responsible for obtaining information on the <br />filing system, file naming convention, and CADD standard at the beginning of <br />the PROJECT. At the PROJECT closing, the Consultant shall submit all <br />13 <br />
The URL can be used to link to this page
Your browser does not support the video tag.