Laserfiche WebLink
<br /> <br /> II ~ . II <br /> ~v <br /> <br /> <br /> Mr. Yoshitake has over 35 years of experience in surveying and engineering, includ- <br /> ing a 13 year career with the A.T. & S.F. Railway Company (currently BNSFF). Mr. <br /> Yoshitake has managed both field and office operations for all phases of surveying <br /> Survey Services and mapping services. His experience spans projects for 30 transit centers and <br /> 114 bridges /grade separations. He has also played a major surveying role on 5 <br /> iiiiiiiii i II~IV ~ ~ ~ III III Vi ~ ili III IV <br /> ~ large design-build projects and 20 railroad yards, including 7 intermodal container <br /> Major course work/1988/Boundary transfer facilities. Mr. Yoshitake is well-versed in the specifications and protocol <br /> Control for CalTrans, CPUC and railroad companies. He has performed Right-of-Way sur- <br /> BS/1973/Forestry veys, design surveys and construction staking for 1,000 projects/tasks for public <br /> Major course work/1971/Engineering agencies, engineers, contractors, architects, railroads, utilities, private developers <br /> PLS/California No: 5822 and owners. <br /> RLS/Arizona, No: 24538 <br /> a i l ~ I I I I i ~ ~ ~ Survey <br /> Project Manager -San Gabriel Trench Phase 1 and 2 (2.2 miles & 4 grade <br /> separations) Reference: Duane Kenagy, PE, Sr. VP, Moffatt & Nichol (562) 423- <br /> 9551,Nogales Grade Separation (UPRR LA Subdivision), Nogales Grade Separation <br /> (UPRR Alhambra Subdivision) and the Brea Canyon Grade Separation. . <br /> I ~ ' I ~ ~ ~ <br /> _ _ _ I Survey Project Manager. (10 miles & 32 grade separations). The Mid- <br /> Corridorsegment is arailroad corridor trench that is 33 feet deep, 40 feet wide, <br /> and 50 feet wide, running between the Artesia (91) Freeway in Compton to the <br /> Santa Monica (10) Freeway in Los Angeles. 32 railroad grade separations were <br /> built over the trench. Mr. Yoshitake managed the combined efforts of 3 survey <br /> companies and an aerial mapping company. <br /> ~ ~ Survey Project Manager- (14 <br /> miles, l3 RR stations, 2 RR boxes and RR yard). Exposition Line Design-Build <br /> Project (8 miles, 9 RR stations, 3 grade separations, RR river bridge & RR box). <br /> Bus Rapid Transit Orange Line Design-Build Project (13 miles) and the Chinatown <br /> Aerial Design-Build Project (3,000 foot long aerial bridge). <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> a <br /> <br /> i , <br /> <br /> II ~ ~ II „ ~ W ~ I ' ~ III II I I <br /> <br /> ir~ ~ ~ . <br />