My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25G - ENGINEERING SRVS GRADE SEPARATION
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2011
>
01/04/2011
>
25G - ENGINEERING SRVS GRADE SEPARATION
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 3:55:46 PM
Creation date
1/4/2011 7:05:54 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Item #
25G
Date
1/4/2011
Destruction Year
2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
176
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br /> <br /> <br /> <br /> affected persons and then bound in appropriate job files. The City of Santa <br /> Ana reserves the right to request proof of said documentation. <br /> <br /> F. ~anualslStandards -Where applicable, engineering design of all PROJECT <br /> improvements shall be compatible and in accordance with the following, but <br /> not limited to: <br /> <br /> • A Policy on Geometric Design of Highways and Streets (AASHTO} <br /> • CPUC General Orders Requirements <br /> <br /> • California Regional Water Quality Control Board Requirements <br /> • Manual of Uniform Traffic Control Devices (MUTCD} <br /> • Standard Specifications for Public Works Construction (SSPWC} <br /> • Caltrans Project Development Procedures Manual (PDPM} <br /> • Caltrans Highway Design Manual <br /> • Caltrans Guidelines for Preparing a Preliminary Environmental Analysis <br /> Report (PEAR} <br /> • Caltrans Standard Environmental Reference <br /> • OCTA Right of Way Manual <br /> • BNSF Design Guidelines for Industrial Track Projects <br /> • BNSF Utility Accommodation Policy <br /> • SCRRA Grade Separation Guidelines <br /> • City of Santa Ana Standard Plans and Specifications <br /> <br /> It shall be the responsibility of the Consultant to verify that the latest version <br /> and/or update of these documents are obtained. <br /> <br /> G. The Consultant's work will be subject to inspections by representatives of the <br /> City of Santa Ana and other involved agencies. <br /> <br /> VI. PROJECT BUDGET <br /> <br /> The maximum project budget for performing all tasks defined in the scope of <br /> work is $1.3 million. <br /> <br /> VII. PERFORMANCE PERIOD <br /> <br /> A. The contract shall begin upon approval by the City Council, and the <br /> Consultant shall commence work after notification to proceed by the City. <br /> Unless extended by contract amendment, the contract shall terminate upon <br /> acceptance by the City of Santa Ana of the PROJECT and upon completion <br /> of the terms of this agreement by the Consultant. <br /> <br /> B. The Consultant is advised that any recommendation for contract award is not <br /> binding on the City until the Agreement and all pertinent paperwork are fully <br /> executed and approved by the City Council. <br /> <br /> <br /> 15 <br />
The URL can be used to link to this page
Your browser does not support the video tag.