My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25B - SANTA ANA BLVD GRADE SEPARATION
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2011
>
01/18/2011
>
25B - SANTA ANA BLVD GRADE SEPARATION
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 3:54:02 PM
Creation date
1/13/2011 1:01:53 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Item #
25B
Date
1/18/2011
Destruction Year
2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
44
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Structural Improvements <br />The proposed Santa Ana Boulevard Grade Separation, and the associated retaining walls shall be studied to determine <br />the most cost effective and efficient structural type, and this will include both pre-cast concrete and steel through plate <br />girder alternatives. The crossing will also be studied in terms of providing an aesthetic bridge structure. <br />Applicable Standards <br />The PSRE shall be prepared similar to CALTRANS' regulations, policies, procedures, manuals and standards. The <br />following items a. through d. are not all-inclusive but are intended only to illustrate types of sources. <br />a. The PSRE will be prepared similar to Caltrans' Project Development Procedures Manual Appendix L - <br />Preparation Guidelines for Project Study Report. <br />b. Roadway design shall be in general conformance with the current CALTRANS Highway Design Manual, <br />Standard Plans and Specifications in English Units. <br />c. Plans and estimates shall be prepared in general conformance with the current editions of the CALTRANS <br />Plans, Specifications and Estimates Guide, Standard Plans and Standard Specification, and Basic Engineering <br />Estimating System or as required by the City. <br />d. This PSRE shall be performed in accordance with CALTRANS and AASHTO standards and practices. Any <br />exceptions to applicable design standards shall be approved by the City via the process outlined in <br />CALTRANS' Highway Design Manual and appropriate memorandums and design bulletins published by <br />CALTRANS. <br />The PRE shall be in accordance with CALTRANS' regulations, policies, procedures, manuals and standards. The <br />following items a. through d. are not all-inclusive but are intended only to illustrate types of sources. <br />a. The PRE will be prepared in accordance with Caltrans' Project Development Procedures Manual Appendix K - <br />Preparation Guidelines for Project Report. <br />b. Roadway design shall be in conformance with the current CALTRANS Highway Design Manual, Standard <br />Plans and Specifications in United States Customary Units. <br />c. Plans and estimates shall be prepared in conformance with the current editions of the CALTRANS Plans, <br />Specifications and Estimates Guide, Standard Plans and Standard Specification, and Basic Engineering <br />Estimating System, or as required by the City. <br />d. This PRE shall be performed in accordance with CALTRANS and AASHTO standards and practices. Any <br />exceptions to applicable design standards shall be approved by the City and Caltrans via the process outlined <br />in the CALTRANS' Highway Design Manual and appropriate memorandum and design bulletins published by <br />CALTRANS. <br />Project Understanding <br />We will obtain Project Approval and Environmental Clearance for the Santa Ana Boulevard Grade Separation Project, <br />and this shall be done by preparing a PSRE, a PRE, a Statutory Exemption (SE), and Categorical Exclusion (CE). <br />We will prepare and obtain approval from the City, the SCRRA/OCTA, Caltrans, and the Federal Highway <br />Administration (FHWA). The PRE will examine roadway alternatives documented in the approved PSRE, based upon <br />forecast traffic volumes, and existing topography, as well as alternatives for the crossing type, and shall recommend a <br />preferred alternative, as well as the approval of the environmental document. <br />We will establish relationships with all the stakeholders in the project to solicit input and develop consensus during the <br />project development process. Input from all stakeholders will be solicited early in the process and will continue <br />throughout project development to facilitate timely review and approval of the project. <br />Cit_v ofSanta Ana <br />25B-21
The URL can be used to link to this page
Your browser does not support the video tag.