MEMORANDUM OF UNDERSTANDING NO. C-9-0825 <br />EXHIBIT A <br />4. Signatures of the author(s) and approval(s) from responsible supervisors. <br />5. Table of contents. <br />6. Description, content, drawings, and schematics as applicable. <br />A minimum of four (4) hard copies and one electronic copy (in a media format as <br />approved by the AUTHORITY in writing) of each deliverable shall be provided, <br />unless otherwise specified in the SOW. CONSULTANT shall also keep a history <br />matrix of all deliverables related to the SOW. CONSULTANT shall provide <br />AUTHORITY with copy of history matrix in hard copy and/or electronic format <br />upon request. <br />6.2 LIST OF PROJECT DELIVERABLES <br />DELIVERABLE TASK TITLE SECTION <br /> <br />SECTION 2.0 PROJECT MANAGEMENT <br />1 Work Plan (NTP + 15 Days) 2.2.6 <br />2 Project Schedule (NTP + 15 Days) 2.2.7 <br />3 Final Deliverables List (NTP + 15 Days) 2.2.8 <br />4 Monthly Progress Reports 2.2.9 <br />5 Action Item Matrix 2.2.12 <br />6 Final Technical Reports 2.2.13 <br />SECTION 3.0 TRAFFIC SIGNAL SYNCHRONIZATION DESIGN FINALIZATION <br /> <br />A6a Bristol/State College BRT Corridor -Technical <br />7 memorandum detailing findings of the design 3.1 .6 <br /> base documentation review <br /> Bristol/State College BRT Corridor -All Final <br /> optimized and synchronized traffic signal timing <br /> plans in Synchro format and the preferred timing <br />8 Ala chart format of each agency, including (a) 3 <br />1 <br />7 <br /> existing corridor conditions and (b) planned and . <br />. <br /> programmed improvements (widening projects <br /> and intersection improvements) within the next <br /> five ears after NTP . <br />Scope of Work 105 05/18/1 O