Laserfiche WebLink
MEMORANDUM OF UNDERSTANDING NO. C-9-0825 <br />EXHIBIT A <br />9 Alb Bristol/State College BRT Corridor -Final Time- 3 <br />1 <br />7 <br /> Space Diagrams . <br />. <br /> <br />10 <br />A7c Bristol/State College BRT Corridor -Final Signal <br />3 <br />1 <br />7 <br /> Timing Optimization Plan . <br />. <br />11 A7d Bristol/State College BRT Corridor -Electronic 3 <br />1 <br />7 <br /> Synchro 7.0 data files used in the Final analysis . <br />. <br /> <br />12 <br />Ale Bristol/State College BRT Corridor -Electronic <br />1 <br />3 <br />7 <br /> Sim Traffic data files used in the Final analysis . <br />. <br /> Bristol/State College BRT Corridor -Electronic <br />1 3 Alf Versions of the Final analysis and all data files 3.1 .7 <br /> includin the Tru-Traffic TS/PP files <br />14 A8a Bristol/State College BRT Corridor -Project 3 <br />1 <br />8 <br /> Meeting Agendas . <br />. <br />1 5 A8b Bristol/State College BRT Corridor -Project 3 <br />1 <br />8 <br /> Meeting Minutes and Action Items . <br />. <br />16 A8c Bristol/State College BRT Corridor -Action Item 3 <br />1 <br />8 <br /> Matrix . <br />. <br /> <br />66a Harbor Boulevard BRT Corridor -Technical <br />17 memorandum detailing findings of the design 3.2.6 <br /> base documentation review <br /> Harbor Boulevard BRT Corridor -All Final <br /> optimized and synchronized traffic signal timing <br /> plans in Synchro format and the preferred timing <br />1 8 B7a chart format of each agency, including (a) 3 2 7 <br /> existing corridor conditions and (b) planned and <br /> programmed improvements (widening projects <br /> and intersection improvements) within the next <br /> five ears after NTP . <br />19 B7b Harbor Boulevard BRT Corridor -Final Time- 3 2 7 <br /> Space Diagrams <br />20 B7c Harbor Boulevard BRT Corridor -Final Signal 3 2 7 <br /> Timing Optimization Plan <br /> <br />21 <br />B7d Harbor Boulevard BRT Corridor -Electronic <br />2 <br />7 <br />3 <br /> Synchro 7.0 data files used in the Final analysis ' <br />' <br /> <br />22 <br />B7e Harbor Boulevard BRT Corridor -Electronic Sim <br />3 <br />2 <br />7 <br /> Traffic data files used in the Final analysis ' <br />' <br /> Harbor Boulevard BRT Corridor -Electronic <br />23 B7f Versions of the Final analysis and all data files 3.2.7 <br /> includin the Tru-Traffic TS/PP files <br />24 gga Harbor Boulevard BRT Corridor -Project Meeting 3 2 8 <br /> Agendas <br />25 ggb Harbor Boulevard BRT Corridor -Project Meeting 3 2 8 <br /> Minutes and Action Items <br />Scope of Work 106 05/18/1 O