Laserfiche WebLink
MEMORANDUM OF UNDERSTANDING NO. C-9-0825 <br />EXHIBIT A <br />recommendations, implementation schedule, improvements accomplished, <br />furnished equipment test results, and procedures for continuing maintenance, <br />surveillance, and evaluation of the coordinated signal system, work performed, <br />data collected: "Before" and "After" studies and project benefits achieved in terms <br />of fuel savings, travel time, and other measurable parameters. The report shall <br />include graphical and table formats for each type of documentation for clarity <br />purposes. The report shall also equate or quantify any savings in travel time, <br />reduction in delay and emissions with type of emissions measured into a <br />monetary figure consistent with current publications. Report formats, including <br />style and content of graphs and tables, shall be approved by the AUTHORITY <br />prior to submission. <br />The report shall document all planned and programmed improvements on the <br />Bristol/State College BRT Corridor as well as recommendations for further <br />infrastructure improvements that would likely improve the corridor signal <br />coordination project results. CONSULTANT shall present the final report and <br />results of the project to the AUTHORITY and city councils as required by <br />AUTHORITY in writing. <br />The report shall include for each intersection: lane configurations, signal phasing, <br />turning movement data, and cycle lengths for existing and proposed timings for <br />all peak periods. In addition, in a separate binder, all traffic signal phase <br />sequences, signal timing plans, and pedestrian timings shall be documented. <br />Finally, the report shall provide recommendations, including cost and benefit <br />estimates, for future improvements to traffic signal infrastructure (signal <br />controllers, vehicle detection, communications, etc.), intersection capacity <br />(appropriate signal phasing, lane geometrics, and alleviation of physical <br />bottlenecks that curtail arterial capacity), and traffic management strategies. <br />CONSULTANT shall submit a Final Bristol/State College BRT Corridor Final <br />Timings and Evaluation Technical Report to AUTHORITY and agencies which <br />addresses all comments provided by AUTHORITY and agencies in the Draft <br />Bristol/State College BRT Corridor Final Timings and Evaluation Technical <br />Report. <br />The Report format shall consist of a Table of Contents, Executive Summary, with <br />technical appendices giving the Background, Methodologies, Before Conditions, <br />After Conditions, Before and After Analysis and Study Results, Elements of <br />Implementation, Special Demonstration of Equipment and Results, Conclusions, <br />Recommendations and Lessons Learned, followed by Appendices. As each <br />corridor has unique properties and functionality, prior to the Report being written, <br />the CONSULTANT shall meet with the AUTHORITY to discuss format and <br />content for each of the respective corridors. <br />Bristol/State College BRT Corridor TSS Implementation Services deliverables (in <br />part to include): <br />Scope of Work 74 05/18/10