My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ORANGE COUNTY TRANSPORTATION AUTHORITY OCTA (3) - 2011
Clerk
>
Contracts / Agreements
>
O
>
ORANGE COUNTY TRANSPORTATION AUTHORITY (OCTA)
>
ORANGE COUNTY TRANSPORTATION AUTHORITY OCTA (3) - 2011
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/23/2017 9:52:32 AM
Creation date
1/14/2011 8:39:42 AM
Metadata
Fields
Template:
Contracts
Company Name
ORANGE COUNTY TRANSPORTATION AUTHORITY OCTA
Contract #
N-2011-005
Agency
PUBLIC WORKS
Destruction Year
0
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
132
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MEMORANDUM OF UNDERSTANDING NO. C-9-0825 <br />EXHIBIT A <br />Ala. Draft Bristol/State College BRT Corridor Final Timings and Evaluation <br />Technical Report. <br />Alb. Final Bristol/State College BRT Corridor Final Timings and Evaluation <br />Technical Report. <br />A7c. Presentations to the AUTHORITY and City Councils. <br />4.2.8 TASK A-8: BRISTOL/STATE COLLEGE BRT CORRIDOR TSS <br />IMPLEMENTATION SERVICES -PROJECT COORDINATION AND MEETINGS <br />CONSULTANT shall develop a schedule for meetings with AUTHORITY, <br />agencies, manufacturers, and others in order to facilitate the TSS <br />Implementation Phase along the Bristol/State College BRT Corridor. <br />CONSULTANT shall attend meetings as directed by AUTHORITY and/or <br />agencies to discuss specific information and requirements related to the signal <br />synchronization along the Bristol/State College BRT Corridor. <br />Meetings will also consist of any specific meeting called by AUTHORITY and/or <br />agencies, at which CONSULTANT's attendance is required. <br />CONSULTANT shall prepare and distribute meeting minutes and action item <br />matrix (Deliverable) to the project team five (5) days after meeting. <br />AUTHORITY and/or its designee shall be provided with draft meeting agendas <br />for their review and written approval prior to the preparation of final meeting <br />agendas. AUTHORITY and/or its designee shall be provided with draft meeting <br />minutes for their review and written approval prior to the distribution of final <br />meeting minutes. AUTHORITY and/or its designee shall be invited and shall <br />participate at every meeting. <br />Bristol/State College BRT Corridor TSS Implementation Services deliverables (in <br />part to include): <br />A8a. Project Meeting Agendas. <br />Abb. Project Meeting Minutes and Action items. <br />A8c. Action Item Matrix. <br />4.3 PART "B" -HARBOR BOULEVARD BRT CORRIDOR TSS <br />IMPLEMENTATION SERVICES <br />4.3.1 TASK B-1: HARBOR BOULEVARD BRT CORRIDOR TSS IMPLEMENTATION <br />SERVICES -SIGNAL TIMING IMPLEMENTATION <br />CONSULTANT shall submit a Harbor Boulevard BRT Corridor technical <br />memorandum containing the field implementation of optimized traffic signal plans <br />Scope of Work 75 05/18/1 O
The URL can be used to link to this page
Your browser does not support the video tag.