Laserfiche WebLink
MEMORANDUM OF UNDERSTANDING NO. C-9-0825 <br />EXHIBIT A <br />Table 4-2 summarizes the time-reference equipment recommendations, <br />including new traffic signal controllers and GPS clocks, determined during the <br />TSS Design Phase that will be required for the Harbor Boulevard BRT Corridor. <br />Scope of Work 77 05/18/1 O