Laserfiche WebLink
MEMORANDUM OF UNDERSTANDING NO. C-9-0825 <br />EXHIBIT A <br />CONSULTANT shall fine-tune, or assist local agency staff in the fine-tuning of, <br />the new settings and timings. CONSULTANT shall fine-tune timings in the field <br />and record all changes. Fine-tuning shall be conducted during times and days <br />that are representative of the times and days for which coordination plans were <br />developed. Fine-tuning shall consist of, at a minimum, driving the <br />Westminster/17th Street BRT Corridor and visually verifying system operation <br />relative to the approved time-space diagrams provided during the TSS Design <br />Phase. Adjustments to offsets and splits shall be included as part of this task. <br />Upon final approval by the AUTHORITY and the respective agencies, one (1) <br />hard copy and one (1) electronic format timing chart, per intersection, shall be <br />provided to the respective agencies. One (1) timing chart per intersection, in <br />electronic format, shall be provided to the AUTHORITY. Timing sheets shall be <br />provided by CONSULTANT at time of turn on. <br />Westminster/17th Street BRT Corridor TSS Implementation Services deliverables <br />(in part to include): <br />C1a. Technical memorandum containing field implementation of optimized <br />traffic signal plans for existing corridor conditions, including all required <br />fine tuning and timing charts as requested by AUTHORITY and agency, <br />and final signal timing implementation plan. <br />The CONSULTANT shall complete all Westminster/17th Street BRT Corridor <br />Signal Timing Implementation tasks prior to May 12, 201 1 . <br />4.4.2 TASK C-2: WESTMINSTER/17TH STREET BRT CORRIDOR TSS <br />IMPLEMENTATION SERVICES -EQUIPMENT PROCUREMENT <br />CONSULTANT shall provide a list of materials, number of units, and prices for <br />the Westminster/17th Street BRT Corridor Signal Synchronization, including <br />traffic signal equipment (traffic signal controllers, traffic signal controller software, <br />and GPS clocks), and associated equipment that will be procured and installed <br />by the CONSULTANT. AUTHORITY and the agencies shall review and <br />AUTHORITY shall approve in writing the list of materials, number of units, and <br />prices prior to ordering the equipment by CONSULTANT. <br />Westminster/17th Street BRT Corridor TSS Implementation Services deliverables <br />(to in part include): <br />C2a. List of Materials, Units, and Prices. <br />C2b. Copies of All Purchase Orders and Product Manuals. <br />4.4.3 TASK C-3: WESTMINSTER/17TH STREET BRT TSS IMPLEMENTATION <br />SERVICES -EQUIPMENT INSTALLATION SCHEDULING OF WORK <br />Scope of Work 89 05/18/1 O