My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
55B - RESO - EIR SAN LORENZO SEWER LIFT
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2011
>
02/07/2011
>
55B - RESO - EIR SAN LORENZO SEWER LIFT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 3:53:43 PM
Creation date
2/1/2011 4:12:23 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Item #
55B
Date
2/7/2011
Destruction Year
2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
140
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Chapter 3 Findings Regarding Project Alternatives <br />3.4.3.3 No Takings Alternative <br />Under this alternative, the City would redesign the Proposed Project so as to avoid the need for <br />condemnation and acquisition of approximately 292 s.f. of APN No. 410-411-19 (Studio Inn). This <br />alternative was originally rejected from detailed analysis in the Draft EIR because it would fail to <br />reduce or avoid the Project's significant and unavoidable environmental impact to the intersection of <br />South Bristol Street/West Segerstrom Avenue during the five weeks in which Construction <br />Configuration C.2 is in place. However, although not required by law, the City evaluated whether a <br />design adjustment could be made to the proposed San Lorenzo Lift Station facility to omit the need <br />for condemnation. As described in Section F.2 of the Final EIR, the City has incorporated minor <br />modification to the Proposed Project's design that would avoid the need for the condemnation of <br />private property in a manner similar to the No Takings Alternative. Specifically, in response to <br />objections from an adjacent property owner regarding the Project's proposal to condemn <br />approximately 292 s.f. of privately-owned property, the City has redesigned of the proposed facility <br />so as to avoid the need for condemnation of privately owned land. As depicted in Final EIR Error! <br />Reference source not found., Conceptual Revised Lift Station Site Plan, and Error! Reference <br />source not found., Originally Proposed and Conceptual Revised Lift Station Site Plan, the proposed <br />lift station facility would continue to be constructed at the west end of San Lorenzo Avenue, but <br />would be constructed along the southern alignment of San Lorenzo Avenue and parallel to West <br />Segerstrom Avenue rather than at the west end of San Lorenzo Avenue that abuts the Studio Inn <br />property (refer to Error! Reference source not found.). <br />3.4.4 Additional Findings <br />3.4.4.1 Findings Related to Recirculation of the Draft EIR <br />CEQA Guidelines Section 15088.5 describes the conditions under which a Draft EIR that was <br />circulated for public review is required to be re-circulated for additional public review and comment. <br />CEQA Guidelines Section 15088.5 states that new information added to a Draft EIR is not significant <br />unless the Draft EIR is changed in a way that deprives the public of a meaningful opportunity to <br />comment upon a substantial adverse effect of the project or a feasible way to mitigate or avoid such <br />an effect (including a feasible project alternative) that the project's proponents have declined to <br />implement. "Significant new information" requiring recirculation includes, for example, a disclosure <br />showing that: <br />• A new significant environmental impact would result from the project or from a new <br />mitigation measure proposed to be implemented. <br />• A substantial increase in the severity of an environmental impact would result unless <br />mitigation measures are adopted that reduce the impact to a level of insignificance. <br />• A feasible project alternative or mitigation measure considerably different from the others <br />previously analyzed would clearly lessen the significant environmental impacts of the <br />project, but the project's proponents decline to adopt it. <br />• The Revised DEIR was so fundamentally and basically inadequate and conclusory in nature <br />that meaningful public review and comment were precluded. <br />As described in Section F.2 of the Final EIR, Revisions to the Proposed Project, minor revisions <br />have been incorporated into the design of the proposed San Lorenzo Lift Station facility. Because <br />the Project as modified would largely be consistent with the project description as studied in the <br />San Lorenzo Lift Station EIR (Project No. 06-3510) 3-7 <br />Findings of Fact/Statement of Overriding Considero _3
The URL can be used to link to this page
Your browser does not support the video tag.