My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
19C - RFP - PARK LANDSCAPE MAINTENANCE SRVS
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2011
>
02/22/2011
>
19C - RFP - PARK LANDSCAPE MAINTENANCE SRVS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 3:52:23 PM
Creation date
2/17/2011 11:55:29 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Item #
19C
Date
2/22/2011
Destruction Year
2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
76
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
b) b) The Contractor shall provide a Certified Irrigation Specialists in each district <br />who possess, at minimum, a Certificate in "Ornamental Horticulture Certificate <br />of Proficiency Specialization in Landscape Irrigation" or hold a current <br />California Landscape Contractors Association "Certified Landscape <br />Technician" certificate to manage each sites irrigation systems controller <br />programming, performance and maintenance including, but not limited to, <br />performing all irrigation checks/report writing and to perform repairs and/or, <br />modifications to the irrigation system. Your proposal will be evaluated on the <br />qualifications of this individual and the amount of FTE's you assign to each <br />district. <br />c) Director may require Contractor to remove any employee from work sites at his <br />or her discretion. <br />3. Materials <br />a) The Contractor shall submit to the Director a list of all materials and/or <br />chemicals that may be used pursuant to the terms of this Agreement. The list <br />shall include Material Safety Data Sheets and chemical analysis where <br />applicable, recommended usage and any other manufacturers data that may be <br />pertinent. The list must be submitted before any materials/chemicals are used <br />pursuant to this Agreement. <br />b) The materials and chemicals utilized in furtherance of this Agreement shall <br />comply with the following standards: <br />(1) All fertilizers shall be complete, furnishing the required percentage of <br />nitrogen, phosphoric acid and potash to keep lawns, trees, shrubs and other <br />plants in a healthy and vigorous growing condition. <br />(2) Pesticides including but not limited to: Insecticides, fungicides, herbicides, <br />algaecides, aviacides, and rodenticides shall be of the best quality <br />obtainable and available on the market, properly labeled with guaranteed <br />analysis, and brought to the job site in the manufacturer's original <br />container. <br />(3) Tree stakes, tree ties and guy wires shall be of materials matching those <br />existing at the work site or as specified by the Director. <br />4. Trash Disposal and Recycling <br />All organic waste (including leaves, grass clippings, brush, branches, and tree parts) <br />resulting from work performed under this contract shall be disposed of pursuant to the <br />requirements of the Santa Ana Municipal Code (SAMC) Chapter 16. Organic waste <br />cannot be taken to a landfill. Every month, the Contractor shall submit receipts from <br />licensed composters/green waste recycling facilities, to the Director listing the tons of <br />organic waste recycled and the names and addresses of the composting or processing <br />companies. <br />14 <br />19C-16
The URL can be used to link to this page
Your browser does not support the video tag.