Laserfiche WebLink
Mechanical Enoineenno <br />Prepare drawings for existing drainage system upgrades <br />Equipment schedule for a new pump <br />Review contractor submittals <br />WQMP/NPDES <br />The project will be classified as a non-priority project (less than 5,000 SF disturbed area). <br />Design of site or treatment control BMPs will not be required. <br />One site visit. <br />The WQMP will be structured as shown in the template included on the Orange County Public Works <br />website. <br />The total cost of the service is $156,480. This cost is based on the following breakdown: <br />Engineering/Mgmt $ 17,200 <br />Engineering/Mgmt $ 4,000 <br />Architectural Engr $ 20,500 <br />Electrical Engr $ 6,700 <br />Structural Engr $ 42,800 <br />Mechanical Engr $ 5,400 <br />Nestor+Gaffney $ 25,000 <br />Structural Group (Insp & prtct) $ 18,800 <br />Structural Group (tendon repair) $ 7,200 <br />Cost Estimate $ 3,500 <br />(Design Phase - coord, mgmt, bid document, WQMP) <br />(Construction Administration) <br />(Design and Construction Administration) <br />(Design and Construction Administration) <br />(Design and Construction Administration) <br />(Design and Construction Administration) <br />(Design and Construction Administration) <br />(Inspection and protect w/ concrete cover over tendons) <br />(if needed - assumes 4 tendons will require repair) <br />Subconsultant mark-up (10%) $ 4,380 (10% of Gaffney plus Structural Group insp /protect) <br />AECOM Trans ODC $ 1.000 <br />Total Cost (this location): $156,480 <br />AECOM Engineering/Mgmt cost for the design phase is based upon: <br />32 hours of coordination <br />40 hours of WQMP/NPDES <br />32 hours to prepare bid documents (technical specs are contained In each consultant's proposal). <br />24 hours - Construction Administration (this is in addition to CA listed for AECOM Architectural <br />and Nestor+Gaffney) <br />ODCs assumed to be $1,000. <br />The scope of work and bid proposal for AECOM Architectural is contained In Attachment A, for <br />Nestor+Gaffney in Attachment B, and for Structural Group in Attachment C. <br />This proposal assumes that the Structural Group will repair four tendons which Is essentially a <br />contingency sum since it is not possible to determine whether the tendons will require repair until the <br />investigation has been conducted. <br />3'd and Birch Parklna Structure <br />The work at this location includes replacement of steel mesh around exterior doors; new egress doors <br />equipped with panic hardware; two roll-up grilles across entrance; security bars/grilles to enclose exterior <br />stairways (this combines having to replace hand railings and adding bars); reverse swing of exterior door; <br />reconfiguration of handicap parking stall and handicap egress near southwest corner of structure. <br />For architectural services detailed scope of work see Attachment A. Note: ADA access will not be <br />checked for the entire garage. Instead, only those areas affected by the work will be checked and <br />reconfigured as necessary (see Attachment A). <br />AECOM <br />80A-10