My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
POWEL CONSTRUCTORS, INC.
Clerk
>
Contracts / Agreements
>
PROJECTS
>
Completed Projects
>
POWEL CONSTRUCTORS, INC.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/2/2025 12:03:57 PM
Creation date
3/23/2011 3:02:22 PM
Metadata
Fields
Template:
Contracts
Company Name
Powell Constructors, Inc.
Contract #
06-1723
Agency
Public Works
Council Approval Date
3/21/2011
Expiration Date
7/24/2014
Notes
Project
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
91
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Project 06 -1723 <br />RFA Change Order No. 7 <br />January 25, 2013 <br />Page 4 <br />height curb and gutter. The additional costs compensate the contractor for all labor and <br />equipment to form and place 298 feet of variable curb and gutter. (PCO 39) <br />AGREED COST= $2,644 <br />14. During an inspection of the existing street section on the west side of the bridge, it was <br />determined that there are two bus stop locations where the curb & gutter and pavement <br />had deteriorated; therefore, it is recommended to construct new PCC bus pads at <br />these locations. The additional costs compensate the contractor for all labor and <br />equipment to remove the pavement and curb & gutter, grade, compact and place two <br />PCC bus pads. (PCO 39) <br />AGREED COST= $38,685 <br />I APPROVED AS TO FUNDS AND ACCOUNTS: <br />Raul odinez, II V Francisco Gutierrez <br />Execu 've Director Executive Director <br />Public Works Agency Finance and Management Services Agency <br />PROJECTS /06- 1723/CO/06 -1723 RFA CO 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.