My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
AECOM 1 - 2011
Clerk
>
Contracts / Agreements
>
_PENDING FOLDER
>
READY TO DESTROY IN 2021
>
AECOM 1 - 2011
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/4/2017 11:58:03 AM
Creation date
4/6/2011 11:51:22 AM
Metadata
Fields
Template:
Contracts
Company Name
AECOM
Contract #
A-2011-024
Agency
PUBLIC WORKS
Council Approval Date
1/18/2011
Expiration Date
1/1/2013
Insurance Exp Date
4/1/2014
Destruction Year
2021
Notes
Amended by A-2011-024-01, -02, -03
Document Relationships
AECOM (FORMERLY DMJM HARRIS) 1A - 2011
(Amended By)
Path:
\Contracts / Agreements\_PENDING FOLDER\READY TO DESTROY IN 2021
AECOM (FORMERLY DMJM HARRIS) 1B - 2011
(Amended By)
Path:
\Contracts / Agreements\_PENDING FOLDER\READY TO DESTROY IN 2021
AECOM (FORMERLY DMJM HARRIS) 1C - 2014
(Amended By)
Path:
\Contracts / Agreements\_PENDING FOLDER\READY TO DESTROY IN 2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
143
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Deliverables: Preliminary Utility Conflict Maps <br />Utility Data Summary; Including a matrix of: Utility Owners, Utility <br />Representatives, Description of Utility Conflicts and Responsibility for the cost of <br />relocation. <br />Task 1.8 Right of Way Requirements <br />ROW Identification/Impacts/Data Sheets <br />Existing right-of-way information, including parcel boundaries will be shown on the alternative layout plans and used <br />to determine the preliminary right-of-way requirements, which may be required for each alternative alignment. The <br />cost of potential right-of-way acquisitions, if any, will be included in the cost estimate for each alternative. Legal <br />descriptions will be prepared, and it is assumed up to 50 (this is excessive, but conservative) shall be required, and this <br />shall be determined during the design. <br />As the proposed alternative layout sheets are refined to include the information required for the PRE, the impacts to <br />right-of-way will also be more thoroughly defined. This updated information will be shown on the right-of-way layout <br />sheets and used to determine the preliminary right-of-way requirements for each alternative alignment. The cost of <br />potential right-of-way acquisitions, including construction easements, will be included in the cost estimate for the PRE. <br />A Right -Of -Way Data Sheet will be prepared and included in the PRE. During the design, right of way needs will be <br />mapped for use in the right of way acquisition phase of the project. <br />Deliverables: Right of Way Requirements Maps <br />Task 1.9 Drainage Analyses/Report <br />Hydrology Study/Report <br />AECOM will prepare a hydrology study for the project area in order to recommend drainage systems adequate for the <br />project improvements. These recommendations will be in the form of drainage plans, and associated cost estimates for <br />these facilities, for inclusion into the PRE, and will ultimately form the basis of the Hydrology and Hydraulics Report <br />prepared during the PS&E phase of the project. <br />Deliverables: Storm Water Data Report <br />Task 1.10 Quantities, Schedule and Estimate <br />AECOM will calculate the preliminary level quantities, produce a preliminary level cost estimate, and produce a <br />preliminary project schedule for inclusion into the PRE. <br />Task 1.11 Project Report Equivalent (Draft and Final) <br />AECOM will produce a Project Report, per the requirements previously mentioned in this document. <br />Deliverables: Project Report Equivalent (Draft and Final) <br />Task 1.12 Environmental Documentation <br />As with all projects the environmental phase of the project controls the schedule. In order for us to have a firmer grasp <br />on this critical part of the schedule, we have included on our team an Environmental Manager. Ms. Alicia Colburn will <br />be serving in this capacity for the duration of the environmental clearance process. <br />City of Santa Ana <br />
The URL can be used to link to this page
Your browser does not support the video tag.