My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
AECOM 1 - 2011
Clerk
>
Contracts / Agreements
>
_PENDING FOLDER
>
READY TO DESTROY IN 2021
>
AECOM 1 - 2011
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/4/2017 11:58:03 AM
Creation date
4/6/2011 11:51:22 AM
Metadata
Fields
Template:
Contracts
Company Name
AECOM
Contract #
A-2011-024
Agency
PUBLIC WORKS
Council Approval Date
1/18/2011
Expiration Date
1/1/2013
Insurance Exp Date
4/1/2014
Destruction Year
2021
Notes
Amended by A-2011-024-01, -02, -03
Document Relationships
AECOM (FORMERLY DMJM HARRIS) 1A - 2011
(Amended By)
Path:
\Contracts / Agreements\_PENDING FOLDER\READY TO DESTROY IN 2021
AECOM (FORMERLY DMJM HARRIS) 1B - 2011
(Amended By)
Path:
\Contracts / Agreements\_PENDING FOLDER\READY TO DESTROY IN 2021
AECOM (FORMERLY DMJM HARRIS) 1C - 2014
(Amended By)
Path:
\Contracts / Agreements\_PENDING FOLDER\READY TO DESTROY IN 2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
143
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
® AECOM <br />17 <br />Schedule <br />AECOM has developed the schedule shown in Figure 9 <br />based upon past experience on similar projects. We have <br />demonstrated our ability to deliver planning documents on <br />grade separations, from Feasibility Studies and PSRE's to <br />full Project Report/Environmental Documents. Within the <br />last 12 months, AECOM has worked on the following grade <br />separation planning documents: <br />• Raymond Avenue <br />• Orangethorpe Avenue <br />• Baldwin Park Avenue <br />• Puente Avenue <br />• Jurupa Avenue <br />• McKinley Street <br />• Streeter Avenue <br />Our experience also helps us understand the critical <br />elements which need to be address to ensure the project <br />schedule is met, and these include: <br />Third Party Coordination — Actively engagingthird parties, <br />from the railroads to the utility companies, from day one <br />of the project is essential. Maintaining the open line of <br />communication and flow of information is crucial to timely <br />responses, direction and approval. Early agreement on design <br />parameters, such as vertical clearances for the railroad, as <br />well as relocation alternatives for utilities, will help pave the <br />path for approvals. <br />Environmental — Engagingthe environmental planners <br />during the initial alignment studies will be critical to ensuring <br />that the all components are adequately covered in the PES <br />or PEAR, which will facilitate approvals through the City for <br />CEQA and Caltrans for NEPA. <br />Response Procedures — AECOM takes a very proactive <br />stance in addressing issues and comments as they arise. <br />This eliminates need for rehashing of previous issues <br />or multi -cycle reviews and responses at each submittal <br />milestone. There are several components in achieving this: <br />1. Develop and action list, each uniquely numbered, to <br />track them from inception to closure. <br />2. Conduct workshop meetings with stakeholders prior to <br />submittals to review the product and receive feedback. <br />3. Develop a comment response matrix to track comments <br />through to closeout. <br />AECOM is confident that in our approach to this project, along <br />with our relationships with the City, SCRRA, OCTA, Caltrans, <br />and the utility companies, we will meet the schedule as <br />shown. <br />ID <br />Task Name <br />Duration <br />M-1 IMI I M2 I M3 I M4 IM5 M6 M7 M8 <br />1 <br />NTP -- <br />- -- - -- <br />0 days <br />2 <br />Phase 1- PSR and PES or PEAR <br />MR - <br />175 days <br />3 <br />-- <br />Project Management/Coordination <br />170 days <br />4 <br />Project Study Report <br />175 days <br />5 <br />Research 8 Data Collection <br />-- --- ------ — <br />5 days <br />---- <br />6 <br />Ob-tain ROE from SCRRA <br />30 days <br />7 <br />_ <br />Prepare/Obtain Approval Traffic Control Plan <br />--- <br />15 days <br />8 <br />-----...--- --- _— <br />Utility Identification <br />50 days <br />9 <br />Topo/Base/Field Work/Design Surveys <br />20 days <br />10 <br />Prepare Alternatives Concepts (3 Min.) <br />50 days <br />11 <br />Prepare Traffic Analysis and TMP for Alts. <br />30 days <br />12 <br />Geotechnical Recommendations <br />- <br />30 days <br />i <br />13 <br />— <br />Structural APS's <br />— <br />30 days <br />14 <br />Hydraulics and Hydrology Study <br />30 days <br />} <br />15 <br />Right -of -Way Identification <br />10 days <br />j <br />16 <br />Cost Estimates <br />20 days <br />17 <br />Structural Type Selection <br />20 days <br />18 <br />Conceptual Engineering Plans for Alts. <br />20 days <br />19 <br />Draft Project Study Report Equivalent <br />30 days <br />20 <br />Submit Draft PSRE to City <br />- ---- <br />0 days <br />; <br />21 <br />City Review Draft PSRE <br />15 days <br />22 <br />Final PSRE <br />10 days <br />23 <br />City Review/Approve Final PSRE <br />15 days <br />24 <br />— <br />Environmental PES or PEAR <br />40 days <br />S <br />25 <br />Environmental PES or PEAR <br />40 days <br />- <br />Figure 9 - Proposed Schedule <br />i Proposal for Project Study Report Equivalent and Conceptual Engineering P!arS for <br />Santa Ana Boulevard Grade Separation Project <br />
The URL can be used to link to this page
Your browser does not support the video tag.