My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
AECOM 1 - 2011
Clerk
>
Contracts / Agreements
>
_PENDING FOLDER
>
READY TO DESTROY IN 2021
>
AECOM 1 - 2011
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/4/2017 11:58:03 AM
Creation date
4/6/2011 11:51:22 AM
Metadata
Fields
Template:
Contracts
Company Name
AECOM
Contract #
A-2011-024
Agency
PUBLIC WORKS
Council Approval Date
1/18/2011
Expiration Date
1/1/2013
Insurance Exp Date
4/1/2014
Destruction Year
2021
Notes
Amended by A-2011-024-01, -02, -03
Document Relationships
AECOM (FORMERLY DMJM HARRIS) 1A - 2011
(Amended By)
Path:
\Contracts / Agreements\_PENDING FOLDER\READY TO DESTROY IN 2021
AECOM (FORMERLY DMJM HARRIS) 1B - 2011
(Amended By)
Path:
\Contracts / Agreements\_PENDING FOLDER\READY TO DESTROY IN 2021
AECOM (FORMERLY DMJM HARRIS) 1C - 2014
(Amended By)
Path:
\Contracts / Agreements\_PENDING FOLDER\READY TO DESTROY IN 2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
143
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
E AECOM <br />preferred alternative. A schedule will be developed, <br />maintained and updated for tracking the project. <br />Deliverables: <br />• Required Copies of Meeting Minutes <br />• Updated Project Schedule <br />• Public Meeting Exhibits <br />Task 1.2 Research and Data Collection <br />Existing reports, studies, proposed and "as -built" plans, <br />mapping or other information will be obtained from the <br />City, utility companies and other agencies as applicable <br />and reviewed by the design team. Data to be obtained <br />and reviewed includes: <br />• Mapping and design information from the City <br />for improvement projects; <br />• Hazardous material/waste information; <br />• Preliminary materials (geotechnical) <br />information; <br />• Traffic data (existing and forecasted traffic, <br />level of service, capacity adequacy, operational <br />analysis, accidents, etc.); and <br />• Right-of-way and utility plans. <br />Task 1.3 Topo/Base/Field Work/Design Surveys <br />Control Surveys <br />Horizontal and vertical corridor control will be <br />established along the corridor to support the aerial <br />photogrammetry, land net surveys, engineering surveys <br />and future design and construction activities along the <br />corridor. The survey control will be set in accordance <br />with Caltrans survey standards and will be tied into the <br />North American Datum of 1983 (NAD83 NSRS 2007) and <br />the North American Vertical Datum of 1988 (NAVD88 <br />Riverside County) or as specified by the client. <br />Land Net Surveys and Mapping <br />This task entails cadastral research within Caltrans <br />District 12 and the County of Orange for existing <br />centerline and right-of-way files and/or available <br />cadastral records in support of the centerline and right- <br />of-way of 1-5, Santa Ana Boulevard, and Lincoln Street. <br />Field surveys will be performed to locate the centerline. <br />In addition, key monuments will be located in order to <br />calculate the centerline of the corridor and adjacent <br />intersecting routes. The right-of-way will be based upon <br />record calculations only and will not be surveyed. <br />A land net base map will be prepared at a scale <br />comparable to the aerial mapping and will include said <br />record centerlines and rights-of-way as well as <br />underlying cadastral information, ownership <br />information as recorded with the Riverside County <br />assessor's office. All these data will be incorporated <br />with the aerial mapping and delivered in a Microstation <br />v8 format. <br />Photogrammetric Mapping <br />The aerial mapping will be prepared in conformance <br />with Caltrans CAD mapping standards and <br />photogrammetric specifications. Horizontal and <br />vertical aerial control panels will be set to meet aerial <br />triangulation requirements. The mapping will be <br />prepared to 1" = 40' scale with 1 -foot contours and will <br />be delivered in a Microstation v8 format. <br />Survey crews will field verify the aerial mapping to <br />delineate planimetrics obstructed by tree coverage or <br />shadows and to verify the contours and spot elevations <br />generated from the aerial mapping. <br />A color digital orthophoto with 3" pixel resolution will be <br />prepared from the 40 -scale imagery. The digital <br />orthophoto will cover the same mapping limits <br />described above. <br />Deliverables: <br />• Aerial Mapping & Field Survey in electronic and <br />hard copy <br />• Digital Ortho Photo <br />Task 1.4 Traffic Operations Analysis <br />We will prepare a traffic operations analysis for the <br />Santa Ana Boulevard grade separation project. The <br />traffic operations analysis will examine existing and <br />forecast future year conditions in the vicinity of the <br />OCTA/SCRRA at -grade crossing with Santa Ana <br />Boulevard. The future year conditions examined will be <br />the project opening year and the project design year (20 <br />years after opening, assumed to be 2035). Conditions <br />examined will include the No Project Alternative and up <br />to three build alternatives. <br />The analysis will include examination of the following <br />intersections: <br />• Santa Ana Bid./1-5 On and Off -ramp. <br />• Santa Ana Bid./Fuller St.. <br />• Santa Ana Bid./Lincoln Ave. <br />• Santa Ana Bld./Santiago Street. <br />We will coordinate with City staff and the PDT to develop <br />an appropriate methodology for forecasting year 2035 <br />volumes at the study locations, relying on the SCAB RTP <br />or OCTA OCTAM traffic model (or as the City requires) <br />data to forecast year 2035 volumes. <br />Specific tasks to be performed for the traffic operations <br />analysis include the following: <br />1. Peak period traffic counts will be collected at up to <br />three study intersections, for two (a.m. and p.m.) <br />three-hour peak periods. The peak periods to be <br />evaluated will be determined in conjunction with <br />the PDT. <br />2. Future yeartraffic volumes forthe locations <br />identified for examination will be developed using <br />Proposal for Project Study Report Equivalent and Conceptual Engineering Plans for <br />Santa Ana Boulevard Grade Separation Project <br />
The URL can be used to link to this page
Your browser does not support the video tag.