Laserfiche WebLink
Chapter 2 CEQA Findings <br />Table 2-1 CEQA Findings <br />Level of <br />Significance after <br />Impact Statement Evidence/Rationale Supporting Findings Mitigation Measures Findings Mitigation <br />break or broken head. These features will <br />assist in conserving water, eliminating the <br />potential of slope failure due to mainline <br />breaks, and eliminating over-watering and <br />flooding due to pipe and/or head breaks. <br />MM4.2-29 Landscape designers shall ensure <br />that Project landscaping of <br />commercial/industrial/common areas uses <br />drought-tolerant and smog-tolerant trees, <br />shrubs, and groundcover to ensure long-term <br />viability and conserve water and energy. <br />MM4.2-30 Landscape designers shall ensure <br />that the landscape plan includes drought <br />resistant trees, shrubs, and groundcover <br />within the parking lot and perimeter. <br />MM4.2-31 Project designers shall ensure that <br />design features incorporate light-colored <br />roofing materials that will deflect heat away <br />from the building and conserve energy. <br />MM4.2-32 The Project designers shall ensure <br />that designs include all illumination elements <br />to have controls to allow selective use as an <br />energy conservation measure. <br />MM4.2-33 Prior to issuance of a building <br />permit, the applicant shall demonstrate that <br />measures have been included to promote ride <br />sharing programs such as, but not necessarily <br />including, publishing ride sharing information <br />for all of the tenants, designating a certain <br />percentage of parking spaces for ride sharing <br />vehicles, designating adequate passenger <br />loading and unloading and waiting areas for <br />ride sharing vehicles, and providing a website <br />or message board for coordinating rides. <br />2-14 Revised Station District Project and FOL Settlement Agreement Findings of Fact/Statement of Overriding Considerations <br /> <br />