Laserfiche WebLink
<br />Chapter 2 CEQA Findings <br />Table 2-1 CEQA Findings <br />Level of <br />Significance after <br />Impact Statement Evidence/Rationale Supporting Findings Mitigation Measures Findings Mitigation <br />until more program funds are available. <br />MM4.11-5 Main Street at First Street—Install <br />a second northbound and southbound left- <br />turn lanes and a dedicated northbound right- <br />turn lane for 2030 and 2035 conditions. <br />MM4.11-6 Lacy Street at Santa Ana <br />Boulevard—Install a traffic signal and provide <br />exclusive left-turn lane for both northbound <br />and southbound directions for both 2030 and <br />2035 conditions. <br />MM4.11-7 Lacy Street at First Street—Install a <br />traffic signal for both 2030 and 2035 <br />conditions, a traffic signal, and provide <br />exclusive left-turn lane for both northbound <br />and southbound directions for both 2030 and <br />2035 conditions. <br />MM4.11-8 Santiago Street at Washington <br />Avenue—Install a traffic signal and provide <br />one exclusive left-turn lane for both <br />eastbound and westbound traffic for 2035 <br />conditions only. <br />MM4.11-9 Santiago Street at Civic Center <br />Drive—Install a traffic signal and provide: one <br />exclusive left-turn lane, one through lane, and <br />one shared through and right-turn lane on <br />northbound and southbound approaches; and <br />one exclusive left-turn lane and one shared <br />through and right lane on eastbound and <br />westbound approaches. The improvement is <br />only needed for 2035 conditions. <br />MM4.11-10 Santiago Street at Santa Ana <br />Drive—Construct a second southbound left- <br />turn lane for 2035 conditions. The <br />improvement is only needed for 2035 <br />Revised Station District Project and FOL Settlement Agreement Findings of Fact/Statement of Overriding Considerations 2-43 <br /> <br />