Laserfiche WebLink
r <br />�. <br />� TT � <br />ire V111�1L1\ 1 1 <br />High Medium Low Hf9h Medium Low <br />Prlortty Prtorlty PNoNty PrloNty PNority PNorlty "Re_ <br />Year' Induetrlaf Industrial Industrial Commercial Commercial Commercial the actions Total <br />2011H2 111 O 276 160 0 620 1i9 1308 <br />Year 2012113 Subtask Total <br />1.0 Subtask No. 1 — Commercial/Induatrial Facility Database <br />Maintenance and Mana ement $ 28.520 <br />Personnel/Labor Classification required for this Subtask: <br />John Shaffer, Principal -in- Charge; Stan Steinbach, QAlQC; Jim Kolk, Project Manager; <br />Ramon Gallegos, GIS /Database / Inspection Manager; Stave Shaffer; Database Developer; <br />Joe Jenkins, Senior Inspector; Noel Legaspi, Inspection QA/QC <br />2.0 <br />Subtask No. 2 — Conduct Facility InapectIons for Fiscal Year <br />$ 131,380 <br />2012/2013 <br />Personnel/Labor Classification required for this Subtask: <br />Joe Jenkins, Senior Inspector; Keith Armstrong, Senior Inspector;Joseph Hunt, Inspector; <br />Ka18n Kornfeind; Inspector; Kyle Wagner, Inspector; Cyrus Saflzadeh, Inspector <br />3.0 Subtask No. 3 — Additional Program Assistance as Requested <br />$ 20,000 <br />Personnel/Labor Classification required for this Subtask: <br />Inspector - 1 12 hrs ®$ 70 /hr = $ 7,840 <br />Senior t?n�ineer /Scientist - 22 hrs � $ 135 /hr = � 2,970 <br />Project Engineer /Scientist - 62 ]trs � $ 125 /hr = $ 7,750 <br />_ <br />Senior Proj. EngrJScientist - 8 hrs � $ 180 /hr = $ 1,440 <br />Total Cost for Fiscal Year 2012/I3 <br />25D -18 <br />$ 179,900 <br />Page 1 O of 32 <br />