My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GTSI CORPORATION (3) - 2011
Clerk
>
Contracts / Agreements
>
_PENDING FOLDER
>
READY TO DESTROY IN 2018
>
GTSI CORPORATION (3) - 2011
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/31/2017 12:41:33 PM
Creation date
7/1/2011 3:37:38 PM
Metadata
Fields
Template:
Contracts
Company Name
GTSI CORPORATION
Contract #
A-2011-113-01
Agency
POLICE
Council Approval Date
4/18/2011
Expiration Date
2/28/2013
Insurance Exp Date
6/2/2013
Destruction Year
2018
Notes
Amended by A-2011-113-01A, A-2012-066, -01, -02
Document Relationships
GTSI CORPORATION 2A - 2011
(Amended By)
Path:
\Contracts / Agreements\_PENDING FOLDER\READY TO DESTROY IN 2018
GTSI CORPORATION 2B - 2012
(Amended By)
Path:
\Contracts / Agreements\_PENDING FOLDER\READY TO DESTROY IN 2018
GTSI CORPORATION 2C - 2012
(Amended By)
Path:
\Contracts / Agreements\_PENDING FOLDER\READY TO DESTROY IN 2018
GTSI CORPORATION 2D - 2012
(Amended By)
Path:
\Contracts / Agreements\_PENDING FOLDER\READY TO DESTROY IN 2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
44
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
9[ O ; „ Santa Ana Police Department <br />` SPA Phase III <br />M Mi55i0n. Yours. <br />GTSI-11-13308 0.0 <br />2.7.5 Task 5 <br />The GTSI Team will compile a list of all of the completion schedule dates for each of the <br />narrowband plans into an overall graphic schedule and tabular format for review and comments. <br />2.7.6 Task 6 <br />The GTSI Team will develop an overall impact statement based upon the compiled information. <br />The Narrowband Evaluation Report will provide the SPA Executive Committee with the current <br />status of narrowbanding within the respective Operational Areas. <br />The completion of Tasks 1 through 6 above will complete Deliverable 24. <br />2.8 Narrowband Technical Support <br />The narrowbanding activity within the SPA has the potential to impact communications <br />interoperability throughout the SPA. The FCC Third -Report and Order stated that if <br />narrowbanding is not completed systems can be ordered to cease functioning or be fined for non- <br />compliance. It is necessary that the SPA be aware of the narrowbanding efforts that have the <br />potential to impact interoperability. It is therefore necessary to carefully orchestrate the <br />narrowbanding process to ensure that at no time will there be significant gaps in the ability of <br />Operational Areas within the SPA to interoperate. If there are significant gaps the SPA <br />membership should be aware of them and have a means to help mitigate those gaps in the interim <br />while action is being taken on implementation. This SOW will provide a mechanism for <br />providing technical narrowband support for those operational areas that require assistance in <br />narrowbanding but might not have the appropriate technical staff to assign to this type of project. <br />Generally the narrowband support provided would include assistance with solutions, cost <br />estimates, maintaining a matrix of narrowband status, and assistance with general FCC and <br />engineering tasks. With the importance of narrow -banding and the possible effects to the overall <br />communications interoperability within the SPA it is important to have technical assistance <br />available to the SPA membership on an as needed basis to support narrowband support activities <br />in the areas of: <br />• Engineering <br />o Verify upgrade capability of existing equipment <br />o Analyze base -line system performance (technical information provided by <br />licensee) <br />o Analyze new system performance (technical information provided by licensee) <br />o Review of FCC license modification data (Technical information provided by <br />licensee) <br />o System propagation analysis (single site reference) <br />• Project support <br />o Review narrowband project plan (plan to be provided by licensee) <br />o Review project plan estimated costs (plan to be provided by licensee) <br />o Available contact for discussion relating to any narrowbanding topic <br />- 14- <br />GTSI Confidential and Proprietary. Use or disclosure of the data contained on this sheet is subject to the restrictions on the title page of this <br />proposal. <br />
The URL can be used to link to this page
Your browser does not support the video tag.