My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25D - AGMT - PRE-PRELIMINARY ENGINEERING ANALYSIS
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2011
>
08/01/2011
>
25D - AGMT - PRE-PRELIMINARY ENGINEERING ANALYSIS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 3:42:09 PM
Creation date
7/28/2011 11:13:09 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
25D
Date
8/1/2011
Destruction Year
2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
58
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
A0 41 ?tso?re Fixed' [ e t? 4TH ST-" . <br />---------------------- <br />Ica >,} ?6aoa_ Pr 3 g`-is? <br />associated members to the team because they bring specific technical expertise, a fresh eye and unparalleled <br />success at maneuvering streetcar projects through the FTA funding grant application process. <br />The flow chart below illustrates how the ongoing work effort will be Integrated into the Pre Preliminary Engineering <br />Analysis. Based on the timing of the ongoing work effort, and the need to proceed into the grant application with one <br />project definition, we propose that upon completion of the environmental technical studies, during the preparation of <br />the draft environmental documents a Preferred Alternative will be identified. Given that the two build alternatives <br />represent a single alignment with design options, and both build alternatives along with a Transportation System <br />Management Alternative, are being equally evaluated In the environmental documents, this will allow preparation of <br />the grant application to move ahead while still protecting the integrity of the NEPA environmental process. <br />FLOW CHARTISCHEDULE <br />Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr <br />AW%; HeN,bg <br />80neft <br />ALTERNATIVES ANALYSIS ;CONCEPTUAL <br />DESIGN /ENVIRONMENTAL PROCESS <br />r .r,.. :.n:,:. _....:.:.... ..: .. ?._ .. ...3 <br />r r r r r r r .... r - wr w. r. r r r r r r .,. .., ww - ... <br />IEEYDECISIONS e <br />PR!-PRELIMINARY <br />NTP , ¦ <br />ENGINEERING ANALYSIS <br />PROCESS ... _. .. _, - <br /> <br /> <br />Section Three - Work Plan 27 <br />25D-31
The URL can be used to link to this page
Your browser does not support the video tag.