Laserfiche WebLink
Task E: Corridor Studies <br />Currently, there are three corridor studies in progress: <br />• SR 55 widening between I-5 and I-405 <br />• 1-5 widening between SR 55 and SR 22 <br />• PE ROW Transit Study between SARTC and LA Union Station <br />All three studies are being led by other agencies, but have direct impacts to <br />the City. Primary concerns are freeway ramp closures, redistribution of local <br />traffic, right of way impacts, and coordination with other City projects. <br />Guidance and direction to the City will be provided including review of all <br />technical reports and attending meetings as necessary.