(9) BENDER READY-MIX CONCRETE MANUFACTURING PROJECT <br />Initial Study/Mitigated Negative Declaration <br />Drainage and Water Quality , <br />• A detention/desilting basin would be constructed in the southeastern portion of the site. This ' <br />basin would be approximately 400 square feet in size and would improve water quality by <br />detaining stormwater on-site. <br />• Three segments of 24-inch bottomless trench (with 4-inch perforated overflow pipe) would be <br />installed along the South Santa Fe Street frontage. The segments would be installed across <br />the three vehicle access points, and would drain into landscaped areas or the proposed <br />detention/desilting basin. <br />Safety <br />• One existing chain-link access gate along South Santa Fe Street swings open towards the <br />roadway. This gate would be replaced by a rolling gate to eliminate any encroachment or <br />safety hazard for vehicles passing by the site. <br />• South Santa Fe Street would be repaved from its centerline to the Bender Ready-Mix property <br />line frontage. <br />2.5,1 PHASING <br />The proposed improvements at the project site would occur in a single phase. Construction is <br />anticipated to begin in late 2011 and would last approximately three months. <br />2.6 PERMITS AND APPROVALS <br />The City approvals required for implementation of the project will include the following, among others: <br />• California Environmental Quality Act clearance <br />• Conditional Use Permit <br />• Lot Merger <br />• Site Plan Review <br />• Grading/Building Permits <br /> <br /> <br /> <br /> <br /> <br />JULY 2011 2-6 PROJECT DESCRIPTION <br />31A-28