My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25B - JAIL MANAGEMENT SYSTEM MAINTENANCE
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2012
>
02/21/2012
>
25B - JAIL MANAGEMENT SYSTEM MAINTENANCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/16/2012 8:03:15 AM
Creation date
2/16/2012 7:59:47 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Police
Item #
25B
Date
2/21/2012
Destruction Year
2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br /> <br /> <br /> <br /> 3.6. System Documentation <br /> ATIMS will document the installed system and will provide up-to-date user manuals and <br /> technical documentation, including a complete data dictionary. The data dictionary will assist <br /> jail staff in creating their own ad hoc queries and reports as well as developing custom reports <br /> <br /> with third party reporting software as desired by the CITY. <br /> <br /> <br /> 4. ATIMS Responsibilities <br /> <br /> Following is a description of ATIMS's responsibilities during the implementation process: <br /> <br /> Pre-installation <br /> 1 Review the CITY's proposed hardware configuration to determine that it is compatible <br /> with ATIMS. <br /> 2 Calculate preliminary total database size based on the CITY-provided transaction <br /> volumes <br /> <br /> 3 Install ATIMS <br /> <br /> a. Provide the City with installation instructions and hardware connection diagrams <br /> <br /> 4 Create training database <br /> 5 Create ATIMS objects and system setup code tables <br /> <br /> 6 Configure the CITY's system tables and enroll users in test database <br /> <br /> 7 Provide general and system administrator training <br /> <br /> 8 Assist the CITY in configuring the production security tables and user privileges <br /> 9 Confirm network connectivity for interfaces <br /> <br /> <br /> <br /> Data Conversion <br /> I Map fields from current system to ATIMS as per the data conversion requirements, using <br /> the CITY-provided documentation, and data. ATIMS will work in conjunction with the <br /> CITY in completing this requirement. <br /> <br /> 2 Create and run data exception reports <br /> a. Review these reports with applicable City Staff <br /> <br /> 3 Perform test conversion. <br /> <br /> a. In coordination with City IT, Jail It and Police Department Staff <br /> <br /> <br /> <br /> <br /> 25B-20 <br />
The URL can be used to link to this page
Your browser does not support the video tag.