My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
55A - SAN LORENZO SEWER LIFT STATION
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2012
>
02/21/2012
>
55A - SAN LORENZO SEWER LIFT STATION
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/22/2016 3:49:20 PM
Creation date
2/16/2012 11:13:35 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
55A
Date
2/21/2012
Destruction Year
2017
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
242
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Chapter 3 Findings Regarding Project AlternatAms Attachment "A" <br />RDEIR Section 5.4.6. This alternative would avoid the proposed Project's significant and <br />unavoidable impact associated with Construction Configuration C.2; however, this alternative would <br />result in a significant and unmitigable near -term impact to a portion of the South Bristol Street road <br />segment that would not occur as part of the proposed Project. This alternative's significant and <br />unmitigable impact to South Bristol Street would occur for approximately 16 weeks (approximately <br />11 weeks longer than the Project's significant and unmitigable impact associated with Construction <br />Configuration C.2). Unavoidable impacts to transportation /traffic would also occur when <br />construction activities disrupt left -turn movements, thereby diverting traffic to adjacent intersections <br />or encouraging cut - through traffic in local neighborhoods; such impacts would not occur in <br />association with the proposed Project. Near -term significant and unmitigable impacts would occur <br />over a longer duration under this alternative; therefore, impacts to traffic and circulation are <br />considered to be greater at Alternative Site No. 4 as compared to the proposed Project site. <br />Total construction air quality /greenhouse gas emissions would be increased under this alternative due <br />to a longer construction period, although average daily construction emissions would be less than <br />significant and similar to the proposed Project. Impacts to near -term water quality and hydrology <br />also would be increased under this alternative due to a larger area of impact, although such effects <br />would be reduced to a level below significant with mitigation. Impacts to noise, utilities and service <br />systems, and water quality and hydrology (long -term) would be similar to the proposed Project. <br />3.4.6.3 Finding and Rationale for Alternative Site No. 4 <br />The City hereby finds that specific economic, legal, social, technological, or other considerations <br />make Alternative Site No. 4 infeasible. <br />Although this alternative would avoid the proposed Project's significant and unavoidable impact to <br />the South Bristol Street /West Segerstrom Avenue intersection, it would introduce a new significant <br />unavoidable impact along South Bristol Street, which would occur for approximately 11 weeks <br />longer than the Project's significant and unmitigable impact associated with Construction <br />Configuration C.2. Therefore, the City finds that implementation of this alternative would result in <br />increased impacts to transportation /traffic as compared to the proposed Project. Accordingly, the <br />City rejects Alternative Site No. 4 as infeasible because it would result in an overall increase in <br />environmental impacts as compared to the proposed Project and would not avoid or substantially <br />lessen any significant effects of the Project. (CEQA Guidelines Section 15126.6(b).) <br />This alternative also is rejected as infeasible because it would fail to meet, or would not be as <br />effective in achieving, the Project's objective to minimize disruptions to existing businesses, since <br />construction of this alternative would require near -term closures of the center median that allows left - <br />turn access into the parking lots of existing businesses. <br />3.4.7 Alternative Site Location No. 5 (Alternative Site No. 5) <br />3.4.7.1 Summary of Alternative Site No. 5 <br />Alternative Site Location Number 5 (Alternative Site No. 5) would involve the construction of a <br />replacement lift station in the parking lot of an existing commercial complex located at 3001 -3005 <br />South Bristol Street in lieu of the proposed Project site. Alternative Site No. 5 is located <br />approximately 0.04 -mile southwest of the proposed Project site. The location of Alternative Site No. <br />5 is depicted on Final EIR Figure 5 -1. The lift station that would be constructed at Alternative Site <br />No. 5 would include an above - ground block structure similar to the proposed Project and would also <br />San Lorenzo Lift Station EIR (Project No. 06 -3510) <br />CEQA Findings of Fact/Statement of Overriding Considerations <br />55A -52 <br />3 -13 <br />
The URL can be used to link to this page
Your browser does not support the video tag.