My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-001 - Statement of Overriding Considerations, and Adopting a Mitigation Monitoring and Reporting Program
Clerk
>
Resolutions
>
CITY COUNCIL
>
2011 -
>
2012
>
2012-001 - Statement of Overriding Considerations, and Adopting a Mitigation Monitoring and Reporting Program
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/28/2012 3:02:32 PM
Creation date
2/28/2012 2:56:36 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Resolution
Date
2/21/2012
Destruction Year
P
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
94
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Chapter 3 Findings Regarding Project Affemathres Attachment 'A' <br />• feature similar equipment and appurtenances as the proposed Project. In addition, the construction of <br />a lift station at Alternative Site No. 5 would require similar construction activities as the proposed <br />Project (including the need to construct a manhole within the South Bristol Street/West Segerstrom <br />Avenue intersection), and would follow a similar construction schedule. Development of a lift <br />station at Alternative Site No. 5 also would require the City to acquire private property to implement <br />a temporary construction easement, accommodate the proposed lift station, and provide easements <br />for proposed sewer lines (as discussed in Section 5.2.3), as the proposed lift station would be <br />constructed within the parking lot of an existing commercial retail center located at 3001-3005 South <br />Bristol Street. <br />3.4.7.2 Summary Comparison of Environmental Effects <br />As summarized in Final EIR Table 5-1 and described in detail in RDEIR Section 5.4.7, relocating the <br />proposed lift station to Alternative Site No. 5 would neither avoid nor reduce the proposed Project's <br />near-term significant and unavoidable construction-related impact at the intersection of South Bristol <br />Street and West Segerstrom Avenue, which would occur between the hours of 7:15 a.m. and 8:00 <br />a.m. and between the hours of 2:30 p.m. and 6:45 p.m. (Monday through Friday); in fact, under this <br />alternative the duration of Construction Configuration C.2 (and the significant unavoidable impact) <br />would increase due to the need to completely cross the West Segerstrom Avenue right-of-way. In <br />addition, development of a lift station at Alternative Site No. 5 would create new, significant near- <br />term impacts transportation/traffic due to inadequate parking capacity. Impacts related to air <br />quality/greenhouse gas emissions, noise, utilities and service systems, and water quality and <br />hydrology would be similar to the proposed Project. <br />• 3.4.7.3 Finding and Rationale for Alternative Site No. 5 <br />The City hereby finds that specific economic, legal, social, technological, or other considerations <br />make Alternative Site No. 5 infeasible. <br />Alternative Site No. 5 would not avoid or substantially lessen the Project's near-term significant and <br />unavoidable construction-related impact at the intersection of South Bristol Street and West <br />Segerstrom Avenue, or any other impacts associated with the proposed Project. <br />Furthermore, this alternative would result in the elimination of approximately 27 parking spaces <br />during near-term construction resulting in a temporary deficiency of six (6) parking spaces for a <br />period of up to twelve (12) months. Because this alternative would result in inadequate parking <br />capacity at an existing commercial retail center during construction, it would substantially interfere <br />with and disrupt the existing commercial retail center that utilizes the parking lot, as well as fail to <br />meet the Project's objective of avoiding detrimental effects to existing businesses. Further, unlike <br />the proposed Project site where the City has an existing sewer easement, construction at this location <br />would require the City to acquire private property to provide easements for proposed sewer lines. <br />Finally, construction of the lift station at this location would replace currently developed, useable <br />land, in contrast to the proposed Project site, which is vacant and undeveloped. Based on these <br />considerations, the City rejects Alternative Site No. 5 as infeasible and finds that it would not avoid <br />or substantially lessen any significant effects of the Project. (CEQA Guidelines Section 15126.6(b).) <br />• <br />San Lorenzo Lift Station EIR (Project No. 06-3510) 3-14 <br />CEQA Findings of Fact/Statement of Overriding Considerations
The URL can be used to link to this page
Your browser does not support the video tag.