My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ALL AMERICAN ASPHALT (7)
Clerk
>
Contracts / Agreements
>
PROJECTS
>
Completed Projects
>
ALL AMERICAN ASPHALT (7)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/12/2024 11:40:28 AM
Creation date
3/12/2012 2:43:33 PM
Metadata
Fields
Template:
Contracts
Company Name
ALL AMERICAN ASPHALT
Contract #
Various
Agency
Public Works
Council Approval Date
6/18/2007
Expiration Date
3/16/2012
Destruction Year
2012
Notes
Project
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
83
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br /> <br /> <br /> Proj. 06-1500, 07-3206, & 09-3521 <br /> ADDENDUM NO. THREE <br /> March 27, 2009 <br /> <br /> Prior to the beginning of excavations requiring shoring, the Contractor shall designate, in <br /> writing to the Engineer, someone whose responsibility is to supervise the project safety <br /> measures and someone whose responsibility is to supervise the installation and removal of <br /> sheeting, shoring, and bracing. <br /> The excavations and shoring, shall be such as to protect all existing improvements and <br /> utilities from any damage and to be fully compatible with all requirements for traffic and <br /> access and the safe performance of the work. <br /> Attention is directed to the trench width distances on the plans. The design of the conduit <br /> and the shoring is based on this maximum width. If the trench width exceeds the maximum <br /> design width, the pipe bedding, pipe D-Load and the shoring shall be redesigned. The <br /> Contractor shall be responsible for any additional costs due to the increased trench width. <br /> <br /> In addition to shoring the excavations in accordance with the minimum requirements of the <br /> Industrial Safety Orders, it shall be the Contractor's responsibility to provide any and all <br /> additional shoring required to support the sides of the excavation against the effects of loads <br /> which may exceed those derived by using the criteria set forth in the Industrial Safety <br /> Orders. The Contractor shall be solely responsible for any damages which may result from <br /> his failure to provide adequate shoring to support the excavation under any or all of the <br /> conditions of loading which may exist, or which may arise during the construction of the <br /> project. <br /> Trench plating required per the traffic control section of these specifications and as directed <br /> by the Engineer shall be capable of supporting H2O loading and have a non-skid surface, <br /> due to the prevailing steep grades and potential for wet weather. <br /> <br /> The lump sum contract price paid for Trench Shoring and Plating shall include all costs <br /> relating to trench safety and shoring of excavations including, temporary steel plating, <br /> temporary AC paving, all cost for obtaining said permit from the Division of Industrial <br /> Safety as described herein and all costs for additional customized structural calculations <br /> required by the contemplated improvements, and no additional allowance will be made <br /> therefor. <br /> <br /> No additional payment will be made as a result of revisions required in the trench support <br /> details, due to a type of soil encountered which requires a method of trench support different <br /> from that approved or due to other unforeseen reasons. <br /> The price per linear foot for RCP pipe in place shall be considered full compensation for <br /> the removal of interfering portions of existing storm drains and improvements; the <br /> closing or removing of abandoned conduit and structures; the excavations of the trench <br /> including temporary resurfacing; the control of ground and surface waters; the <br /> preparation of subgrade; potholing; placing and joining pipe; bedding and backfill; Post <br /> CCTV Inspection; providing as-built plans and all other work necessary to install the <br /> pipe, complete in place. NOTE: Permanent roadway pavement section is paid for under <br /> the AC Pavement Base Course and AC Pavement Surface Course (2% latex) bid items. <br /> <br /> <br /> 40 <br />
The URL can be used to link to this page
Your browser does not support the video tag.