My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ADVANCED TECHNOLOGY INFORMATION MANAGEMENT SYSTEMS (ATIMS) -2012
Clerk
>
Contracts / Agreements
>
A
>
ADVANCED TECHNOLOGY INFORMATION MANAGEMENT SYSTEMS (ATIMS) -2012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/6/2018 4:10:26 PM
Creation date
4/3/2012 11:30:52 AM
Metadata
Fields
Template:
Contracts
Company Name
ADVANCED TECHNOLOGY INFORMATION MANAGEMENT SYSTEMS (ATIMS)
Contract #
A-2012-029
Agency
POLICE
Council Approval Date
2/21/2012
Expiration Date
2/22/2017
Insurance Exp Date
4/1/2017
Destruction Year
2022
Document Relationships
ADVANCED TECHNOLOGY INFORMATION MANAGEMENT SYSTEMS (ATIMS) 1a-2012
(Amends)
Path:
\Contracts / Agreements\A
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3.6. System Documentation <br />ATIMS will document the installed system and will provide up -to -date user manuals and <br />technical documentation, including a complete data dictionary. The data dictionary will assist <br />jail staff in creating their own ad hoc queries and reports as well as developing custom reports <br />with third party reporting software as desired by the CITY. <br />4. ATIMS Responsibilities <br />Following is a description of ATIMS's responsibilities during the implementation process: <br />Pre - installation <br />1 Review the CITY's proposed hardware configuration to determine that it is compatible <br />with ATIMS. <br />2 Calculate preliminary total database size based on the CITY - provided transaction <br />volumes <br />3 Install ATIMS <br />a. Provide the City with installation instructions and hardware connection diagrams <br />4 Create training database <br />5 Create ATIMS objects and system setup code tables <br />6 Configure the CITY's system tables and enroll users in test database <br />7 Provide general and system administrator training <br />8 Assist the CITY in configuring the production security tables and user privileges <br />9 Confirm network connectivity for interfaces <br />Data Conversion <br />1 Map fields from current system to ATIMS as per the data conversion requirements, using <br />the CITY - provided documentation, and data. ATIMS will work in conjunction with the <br />CITY in completing this requirement. <br />2 Create and run data exception reports <br />a. Review these reports with applicable City Staff <br />3 Perform test conversion. <br />a. In coordination with City IT, Jail It and Police Department Staff <br />
The URL can be used to link to this page
Your browser does not support the video tag.