My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ORANGE COUNTY TRANSPORTATION AUTHORITY (OCTA) (C-1-3024)
Clerk
>
Contracts / Agreements
>
O
>
ORANGE COUNTY TRANSPORTATION AUTHORITY (OCTA)
>
ORANGE COUNTY TRANSPORTATION AUTHORITY (OCTA) (C-1-3024)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/4/2024 4:47:49 PM
Creation date
7/30/2012 10:39:30 AM
Metadata
Fields
Template:
Contracts
Company Name
ORANGE COUNTY TRANSPORTATION AUTHORITY (OCTA) (C-1-3024)
Contract #
A-2011-267
Agency
PUBLIC WORKS
Council Approval Date
12/19/2011
Expiration Date
9/30/2014
Destruction Year
2019
Notes
(SANTA ANA, ANAHEIM, ORANGE, PLACENTIA, TUSTIN)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
59
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
COOPERATIVE AGREEMENT NO. C -1 -3024 <br />1 E. To provide updated timing plans and traffic count data to the PARTICIPATING <br />2 AGENCIES. <br />3 F. To prepare a "Before and After Study" for the PROJECT. As described in the Measure <br />4 M2 Eligibility Guidelines adopted by the AUTHORITY, the "Before and After Study" for the project is <br />5 considered the equivalent of the required Project Final Report (Measure M2 Ordinance No. 3, Section <br />6 B.I11.9) for the project. The AUTHORITY shall provide the "Before and After Study" to the <br />7 PARTICIPATING AGENCIES in draft and final formats for comment and comments shall be noted in <br />8 the final study. <br />9 G. To provide Ongoing Maintenance and Operation of optimized signal timing after Primary <br />10 Implementation of the PROJECT is completed and continue until the end of the three year grant period. <br />11 ARTICLE 5. RESPONIBILITES OF THE PARTICIPATING AGENCIES <br />12 The PARTICIPATING AGENCIES agree to the following responsibilities for implementation <br />13 11 and funding of the PROJECT: <br />14 11 A. Provide a technical representative to meet and participate as a member of the <br />15 11 project's Traffic Forum. <br />16 11 B. To authorize the AUTHORITY to manage, procure, and implement all aspects of the <br />17 11 project. <br />18 <br />C. <br />To <br />participate and <br />support the PROJECT <br />implementation within the timeframe <br />19 <br />outlined in <br />the <br />APPLICATION <br />and consistent with the <br />CTFP Guidelines adopted by the <br />20 Il AUTHORITY. <br />21 D. To provide the AUTHORITY all current intersection, local field master, and /or central <br />22 control system timing plans and related data upon request. <br />23 E. To provide the local match and /or documentation for the in -kind services for the <br />24 project in accordance with Attachment B. Failure to provide included match and /or evidence of in- <br />25 kind service may result in the loss of future participation for competitive funds. <br />rl= <br />Page 6 of 17 <br />
The URL can be used to link to this page
Your browser does not support the video tag.