My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
31B - CUP - 1901 NORTH FAIRVIEW ST
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2012
>
09/04/2012
>
31B - CUP - 1901 NORTH FAIRVIEW ST
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/22/2016 1:46:24 PM
Creation date
8/30/2012 12:38:32 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Planning & Building
Item #
31B
Date
9/4/2012
Destruction Year
2017
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
242
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Santa Ana <br />Environmental Checklist <br />project -level analysis using ICU increase of 0.010 or greater at a signalized intersection currently <br />operating at LOS E or F. For unsignalized intersections, acceptable conditions include LOS C or <br />better, per the HCM unsignalized methodology. <br />Phase 1 Near -Term Cumulative Traffic Conditions —2013 <br />Baseline traffic conditions in the Phase 1 near -term 2013 scenario comprise existing traffic <br />conditions, ambient growth, foreseeable future roadway improvements, and traffic generated by <br />cumulative projects numbers 1, 2, and 3 (listed in Table 3 -34 within the cumulative study area). <br />Roadway improvements expected to occur by 2013 include the signalization of the intersection of <br />Fairview Avenue and Edna Drive and would include protected turning phases in the north -south <br />direction and a southbound left -turn pocket and a northbound U -turn pocket. As shown in Table 3- <br />35, intersection operations would not exceed the minimum acceptable LOS without the project in <br />the year 2013, except for the signalized intersection of Fairview Street at 17th Street /Westminster <br />Avenue, which would operate at LOS E in 2013 without the proposed project. <br />As shown in Table 3 -35, the addition of project traffic would not result in an ICU increase of 0.010 or <br />greater, indicating that the project will not significantly impact any of the signalized study <br />intersections during either the AM or PM peak hour. Although the analyzed unsignalized <br />intersections operate at LOS E or worse, the TIA determined that a traffic signal is not warranted. <br />Thus, operation of Phase i will not significantly impact any of the analyzed unsignalized <br />intersections during either the AM or PM peak hour. Further, the proposed project would not <br />contribute to any cumulative impacts to intersections in the Phase I near -term 2013 condition. <br />Phase 11 Near -Term Cumulative Traffic Conditions —2019 <br />Baseline traffic conditions in the Phase 11 near -term 2019 scenario comprise existing traffic <br />conditions, ambient growth of 1% per year over the seven -year period between the existing and <br />opening year, and traffic generated by all cumulative projects (listed in Table 3 -32) within the <br />cumulative study area. As shown in Table 3 -36, intersection operations would not exceed the <br />minimum acceptable LOS without the project in the year 2019, except for the signalized intersection <br />of Fairview Street at 17th Street /Westminster Avenue, which would operate at LOS E in 2019 <br />without the proposed project. <br />As shown in Table 3 -36, the addition of project traffic would not result in an ICU increase of 0.010 or <br />greater, indicating that the project will not significantly impact any of the signalized study <br />intersections during either the AM or PM peak hour. Although the analyzed unsignalized <br />intersections operate at LOS E or worse, the TIA determined that a traffic signal is not warranted. <br />Thus, operation of Phase II will not significantly impact any of the analyzed unsignalized <br />intersections during either the AM or PM peak hour. Further, the proposed project would not <br />contribute to any cumulative impacts to intersections or roadway segments in the Phase 11 near - <br />term 2019 condition. <br />Long -Term Cumulative Traffic Conditions —2035 <br />Similar to near -term cumulative traffic conditions, baseline traffic conditions in the year 2035 <br />comprise existing traffic conditions, ambient growth based on traffic forecasts from the OCTAM, and <br />traffic generated by the cumulative projects as provided in Table 3 -32. <br />As shown in Table 3 -37, the intersections of Fairview Street and Trask Avenue and Fairview Street <br />and 17th Street /Westminster Avenue are anticipated to operate below the City's acceptable LOS <br />The Academy Charter High School 3 118 June 2012 <br />Initial Study /Mitigated Negative Declaration I f 00914.11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.