My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
31B - CUP - 1901 NORTH FAIRVIEW ST
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2012
>
09/04/2012
>
31B - CUP - 1901 NORTH FAIRVIEW ST
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/22/2016 1:46:24 PM
Creation date
8/30/2012 12:38:32 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Planning & Building
Item #
31B
Date
9/4/2012
Destruction Year
2017
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
242
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Santa Ana <br />Environmental Checklist <br />threshold of LOS D during both the AM and PM peak hours without project traffic in 2035. Table 3- <br />37 indicates that the addition of project trips would increase traffic at the intersection of Fairview <br />Street and 17th Street /Westminster Avenue in the AM peak hour by a V/C ratio of 0.025, which is <br />above the threshold of 0.010. As a result, the proposed project would contribute to a cumulatively <br />significant impact at the intersection of Fairview Street at 17th Street/Westminster Avenue during <br />the AM peak hour. <br />The City of Santa Ana requires project impacts to be mitigated to an acceptable LOS, which is LOS D <br />or better at the intersection of Fairview Street and 17th Street /Westminster Avenue. The TIA <br />identified an intersection improvement that would add a dedicated westbound right -turn lane and a <br />signal phasing modification at the intersection. Modifying the westbound approach from a left -turn <br />lane, two through -lanes and a shared through right -turn lane; to a left -turn lane, three through -lanes <br />and a dedicated right -turn lane along with a westbound right -turn overlap phase to the signal <br />phasing would decrease the V/C ratio to an acceptable level. The V/C is projected to be 0.926 under <br />Future Buildout Year (2035) Plus Project Conditions. However, implementation of the intersection <br />improvements would reduce the V/C ratio to 0.898, which is within the City's standard acceptable <br />threshold of LOS D. <br />To mitigate the proposed project's contribution to the future cumulative traffic condition, the T1A <br />provided a fair share calculation at the impacted intersection for the AM peak hour to determine the <br />project's fair -share contribution to the proposed mitigation measure. The percentage was developed <br />by taking the total project -only traffic volume and dividing it by the total increase in traffic volume <br />between Existing (2012) and Future Buildout Year (2035) with Phase 11. The project's fair -share <br />contribution percentage was calculated to be 4.5 %, and is implemented through Mitigation Measure <br />TR -1 to complete intersection improvements at the intersection of Fairview Street at 17th Sheet/ <br />Westminster Avenue. <br />Incorporation of this mitigation would reduce the project's cumulatively considerable impacts to a <br />less - than - significant level and with incorporation of Mitigation Measure TR -3, the intersection of <br />Fairview Street at 17th Street /Westminster Avenue would operate at LOS D, which is an acceptable <br />level. Traffic warrants would not be met under cumulative conditions in the long -term 2035 <br />condition. <br />Mitigation Measure TR -3: Prior to the issuance of occupancy permits, the applicant shall pay a fair - <br />share contribution toward the Fairview Street at 17th Street /Westminster Avenue intersection <br />improvements that involve modifying the westbound approach from a left -turn lane, two through - <br />lanes and a shared through right -turn lane; to a left -turn lane, three through lanes and a dedicated <br />right -turn lane along with a westbound right -turn overlap phase to the signal phasing. This fair - <br />share contribution shall be 4.5% of the improvement cost. The City would be responsible for <br />implementing the intersection improvements in the future prior to year 2035. <br />The Academy Charter High School 3 119 June 2012 <br />Initial Study /Mitigated Negative Declaration ICF0092012 <br />31 B -201 <br />
The URL can be used to link to this page
Your browser does not support the video tag.