My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PLANNING CENTER, THE 8E - 2012
Clerk
>
Contracts / Agreements
>
_PENDING FOLDER
>
READY TO DESTROY IN 2020
>
PLANNING CENTER, THE 8E - 2012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/7/2016 1:26:22 PM
Creation date
1/9/2013 12:15:08 PM
Metadata
Fields
Template:
Contracts
Company Name
PLANNING CENTER, THE
Contract #
A-2012-074
Agency
PUBLIC WORKS
Council Approval Date
4/2/2012
Expiration Date
12/31/2013
Insurance Exp Date
7/1/2014
Destruction Year
2020
Notes
Amends A-2007-167, A-2008-139, -001, -002, -003 Amended by A-2013-025, -01
Document Relationships
PLACEWORKS FORMERLY KNOWN AS THE PLANNING CENTER 8g - 2013
(Amended By)
Path:
\Contracts / Agreements\_PENDING FOLDER\READY TO DESTROY IN 2020
PLANNING CENTER, THE 8 - 2007
(Amends)
Path:
\Contracts / Agreements\_PENDING FOLDER\READY TO DESTROY IN 2020
PLANNING CENTER, THE 8A - 2008
(Amends)
Path:
\Contracts / Agreements\_PENDING FOLDER\READY TO DESTROY IN 2020
PLANNING CENTER, THE 8B - 2008
(Amends)
Path:
\Contracts / Agreements\_PENDING FOLDER\READY TO DESTROY IN 2020
PLANNING CENTER, THE 8C - 2008
(Amends)
Path:
\Contracts / Agreements\_PENDING FOLDER\READY TO DESTROY IN 2020
PLANNING CENTER, THE 8D - 2008
(Amends)
Path:
\Contracts / Agreements\_PENDING FOLDER\READY TO DESTROY IN 2020
PLANNING CENTER, THE 8F - 2013
(Amended By)
Path:
\Contracts / Agreements\_PENDING FOLDER\READY TO DESTROY IN 2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
47
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
presence of hazardous substances and petroleum products inay,iot be applicable to areas beneath existing structures, unless <br />specific subsurface exploration, sampling, and /or testing Information Is available and reviewed by us for stich areas. <br />Deliverable, <br />O Modified Phase I Site Assessment Report <br />ARCFIEOLOGICAL /I-11STORICAL RESOURCE SURVEYS <br />Prepare a Historic Resources Evaluation Report (HRER) to Include identification and evaluation efforts, Including a sununary <br />of findings, project description, historic contextual overview, evaluation of historic properties, determination of findings of <br />significance and project impacts and conclusions. The properties shall be evaluated using the criteria for the National Register <br />of Historic Places (NRHP) and the California Register of Historical Resources (CRHR). <br />Prepare a Historic Properties Survey Report (HPSR) that will include project maps and tine results of Identillcation and <br />evaluation for properties more than 45 years old. The HPSR will Include the Historic Resources Evaluation Report (HRER) <br />and Archaeological Survey Report. (ASR) as appendices. Urbana will coordinate with tine archaeologist to compile the <br />information contained in the ASR for preparation of the HPSR in the standard format. <br />Deliverable; <br />Historic Properties Survey Report -- including Historic Resources Evaluation Report and Archaeological Survey <br />Report <br />MISTORIC:AI.. RI.CORDS AND LITERATURE SEARCH <br />A search for records of known archaeological and historical sites will be requested from the South. Central Coastal <br />Information Center at California State University at Inullerton. A record search for sacred lands will be requested from the <br />Native American Heritage Commission. In addition, we will send subsequent letters to all Native Americans the Commission <br />recommends be contacted to elicit any information they may have. Current procedure under Section 106 is to send the letters, <br />wait two weeks for response and If none, make a minimum of three attempts to elicit comments via phase. <br />Deliverable; <br />Historic Records Search <br />Environmental Clearance <br />DATA COLLECTION <br />The Planning Center will work with the City and all team members to gather appropriate data required for tine successful <br />completion of the environmental documentation and clearance. <br />INITIAL. STUDY <br />An Initial Study will be prepared according to the City's standard Initial Study checklist. Since it is already anticipated that an <br />EIR will be required, it is assumed that ni iiiy of tine checklist responses will consist of brief responses that explain the scope of <br />the analysis to be Included in the Project EIR. A limited number of topical areas, liowever, are expected to be elhninated fram <br />further environmental review through documentation in the Initial Study. At this time it is anticipated that a compreleilsive <br />City of Santa Ana - Proposal to Prepare Environmental Documents for Warner Avenue Widening Project The Planning Center t Page 12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.