My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25B - AGMT - ENVIRONMENTAL SERVICES FOR WARNER AVE WIDENING
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2013
>
02/04/2013
>
25B - AGMT - ENVIRONMENTAL SERVICES FOR WARNER AVE WIDENING
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/4/2013 9:42:44 AM
Creation date
1/31/2013 4:49:50 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
25B
Date
2/4/2013
Destruction Year
2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
48
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
February 10, 2012 <br />Page 3 <br />TASK 14. PLANNING COMMISSION <br />Two hearings; revised to include attendance at one hearing. <br />TASK 15. CITY COUNCIL <br />Two hearings; revised to include attendance at one hearing. <br />TASK ORIGINAL. PROPOSAL AMENDMENT <br />Task 11. Project Meetings 5 Total 8 Total <br /> 1. Kick-off meeting 1. Kick-off meeting (March 1, 2009) <br />) <br /> 2. Team meeting 2. Team meeting (May 14, 2009) <br /> 3. Draft E1R review 3. Project Status Meeting (April 12, 2010) <br /> 4. Final FIR review 4. 2nd kick-off (October 5, 2011) <br /> 5. Planning Commission hearing 5. City Council hearing / workshop <br /> preparation (October 17, 2011) <br /> 6. Project Status Meeting <br /> (November 29, 2011) <br /> 7. Project Team Meeting <br /> (December 14, 2011) <br /> 8. Project Team Meetirig (January 5, 2012) <br />Task 12. EfAC + RDA 2 1 (tut can be used for other meeting <br /> requirement) <br />Task 13. Public Scoping Meeting <br />M 1 1 <br />Task 14. Planning Commission 2 <br />V 1 <br />Task 15: City Council 2 1 <br />Total Meetings 12 12 <br />TASK 16. NOISE & VIBRATION <br />Using the revised traffic study specifics, we will reassess the noise conditions for existing conditions (if changed <br />from 2009), as well as the future scenarios for the buildout year with and without the project. The analysis will <br />include revisions to the assessment of future noise impacts for sensitive receptors that are currently in the second <br />and third row from the street, but will be adjacent to the roadway following the street widening. It is assumed <br />that the remainder of the previous noise technical report sections, such as the baseline survey, the construction <br />analyses, and the assessment of stationary sources, can be used in their entirety without updates or <br />modifications. <br />TASK 17. AIR QUALITY AND GREENHOUSE GAS EMISSIONS <br />The air quality modeling and analysis is currently based on the traffic analysis prepared by 181 Group in November <br />2009. The baseline and forecast year traffic volumes will be revised by 101 Group; therefore, revisions to the air <br />quality and greenhouse gas (GHG) emissions analysis will be required to ensure the environment document is <br />internally consistent. In addition, since 2009 the South Coast Air Quality Management District (SCAQMD) has <br />released a new air quality model for analyzing construction and operational impacts. Construction impacts were <br />previously analyzed using the URBEMIS2007 model and will be updated using SCAQMD's new Calrl:Mod <br />program in accordance with SCAQMD guidance. <br />25B-24
The URL can be used to link to this page
Your browser does not support the video tag.