My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
RBF CONSULTING 3 - 2013
Clerk
>
Contracts / Agreements
>
_PENDING FOLDER
>
READY TO DESTROY IN 2021
>
RBF CONSULTING 3 - 2013
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/14/2018 2:52:13 PM
Creation date
4/29/2013 1:12:24 PM
Metadata
Fields
Template:
Contracts
Company Name
RBF CONSULTING
Contract #
A-2013-014
Agency
PUBLIC WORKS
Council Approval Date
1/22/2013
Expiration Date
12/31/2014
Insurance Exp Date
8/30/2015
Destruction Year
2021
Notes
Amended by A-2013-014-01
Document Relationships
RBF CONSULTING 3A - 2015
(Amended By)
Path:
\Contracts / Agreements\_PENDING FOLDER\READY TO DESTROY IN 2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
41
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Task 4.3 Atlas Map Creation <br />RBF will create electronic (PDF) Atlas Maps for the City utilizing ArcGIS or Microstation. For cost estimating <br />purposes, the atlas maps are assumed to be 17x22 maps at 1"=200' scale for the entire 27 square miles city area. <br />A draft of the atlas maps will be provided to the City for review prior to finalizing the Atlas maps for the whole city <br />(approximately 67 sheets). The atlas maps will include industry standard symbolization; attribute labels and <br />features the City determines necessary as part of an annotation feature class suitable for 17x22 -inch mapping. <br />Atlas maps are assumed to be Black and white for ease of plotting and reduced costs to the City for future <br />reproduction. <br />Deliverables: <br />1. Altas maps at 1"= 200' <br />TASK 5 Report <br />Task 5.1 Draft Report — Storm Drain Master Plan Document <br />RBF will provide engineering services for the compilation of a new Storm Drain Master Plan to support the <br />proposed hydrology and hydraulic analysis and recommended drainage facilities. The written report will serve as <br />the technical documentation for the preliminary engineering design and selection of the recommended watershed <br />improvements. This report will include the background for the watershed investigation, hydrologic modeling, <br />hydraulics analysis, alternatives analysis, storm drain design and sizing, and flood protection requirements. This <br />document will serve to reference the design assumptions, guidelines, and criteria developed for the project. The <br />text of the document will be prepared in MS Word. <br />The draft Report will also serve as the initial engineering submittal package for the facility for review by the City. <br />The engineering analysis and associated documentation will include (1) hydrology analysis, (2) watershed <br />evaluation (3) existing systems hydraulic capacity, (4) facility design considerations, (5) required systems <br />hydraulics- (6) feasibility alternative investigation and design selection matrix, and (7) facility construction costs. <br />The repor will be prepared in a format agreed to by the City. <br />Deliverables: <br />1. One (1) PDF, and three (3) hard copies will be provided of Draft Report. <br />Task 5.2 Final Report — Storm Drain Master Plan <br />A final report will be prepared which incorporates comments and modifications from the draft review by the City. <br />Deliverables: <br />1. Twenty (20) copies of the final main report will be provided to the City, <br />2. Three (3) copies of the Appendix. <br />3. Copies of all files will also be provided on a CD. <br />Task 5.3 Final Drainage Exhibits / Maps <br />Provide engineering services to generate the final drainage map exhibits associated with the master plan of <br />drainage. These drainage exhibits will consist of the following: <br />• Drainage Index Map (Drainage Basins) <br />■ Watershed Hydrology Map (Basins and Drainage Districts) <br />The hydrology maps will be prepared on the developed base sheets, modifying the existing drainage and will <br />include the hydrologic concentration points or nodes clearly identified and the associated design discharge. <br />Facility maps will indicate the recommended sizes and lengths for the backbone infrastructure. The drainage index <br />map will be prepared at a suitable scale for use by City. <br />26 <br />
The URL can be used to link to this page
Your browser does not support the video tag.