My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WS_DEPT BUDGET PRESENTATIONS - TWO YEAR BUDGET FY13-15
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2013
>
05/28/2013
>
WS_DEPT BUDGET PRESENTATIONS - TWO YEAR BUDGET FY13-15
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/5/2013 1:59:52 PM
Creation date
5/29/2013 12:26:26 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Finance & Management Services
Date
5/28/2013
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
107
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Furlough Hours <br />Returning <br />SectionNumber of SEIU Employees <br />per Month <br />(Approx.) <br />WATER RESOURCES: <br />WaterEngineering: <br />Complete 17Street Water Main Improvement Plans and <br />th <br />• <br />2Senior Civil Engineer <br />Specifications to 100% Designstatus.64 <br />2 Assistant Engineer II <br />Complete implementation of modified digital field data <br />• <br />acquisition forms for water quality section. <br />Water Production:96 <br />1 Senior Water Systems Operator <br />Place Well 35 back into active service. <br />• <br />1 Instrument Technician <br />Complete 16 deferred maintenance work orders. <br />• <br />4 Water Systems Operator II/III <br />Water Maintenance Services: <br />1 Water Services Supervisor <br />Perform preventative maintenance on 58 fire hydrants.176 <br />• <br />1 Water Services Crew Leader <br />Exercise 58 water distributionvalves.3 EquipmentOperator-Water Services <br />• <br />6 Water ServicesWorker I/ II <br />Replace 13 domestic water service lines. <br />• <br />Sewer: <br />1 Water Services Supervisor <br />Reduce sewer lateral backlog waiting time by one week. <br />• <br />1 Water Services Crew Leader <br />176 <br />Performpreventative maintenance on 104,000 feet of sanitary 4 EquipmentOperator-Water Services <br />• <br />5 Water ServicesWorker I/II <br />sewer main. <br />MeterShop: <br />1 Water ServicesQuality Coordinator <br />1Water Services Quality Supervisor <br />Replace 128, 5/8” water service meters. <br />• <br />3WaterServices Quality/Utility Inspector 128 <br />3 Water Services Meter Repairer II <br />31 <br />
The URL can be used to link to this page
Your browser does not support the video tag.