• Refurbish hall door hardware only as necessary, which shall include rollers, contacts, <br />gibs, pick -up assemblies and door closers. <br />• Provide new door clutch and restrictor <br />• Provide new infrared door detector edge. <br />• Hydraulic Power Unit <br />• Provide and install one new hydraulic submersible power unit, in its entirety, <br />consisting of, but not limited to, new valve, tank, motor and pump, <br />• Machine Room (post Installation) <br />• Clean machine room floor of dirt, oil and grease. <br />• Pain machine room floor with one coat of oil resistant paint. <br />• Apply one coast of field applied machinery enamel to machine room equipment, hoist <br />way equipment, and all exposed equipment installed as part of this specification. <br />Alternate Bid #1: Cab Interior <br />• Dismantle interior of existing elevator and prep for new finishes <br />• Install Snap cab Reflections, Modern, Classic style cab on back and sidewalls <br />• Install new style economy style ceiling inside the above one passenger elevator <br />• Install ADA compliant steel handrail <br />• Install brushed stainless steel on the car door, front return walls, header and car columns <br />• Return elevator back to service <br />Alternate Bid #2: Fire /Smoke Detectors: <br />• Install smoke detector at each elevator lobby entrance and one in the machine room <br />• Install smoke detector at top of the elevator hoist way. Provide access from the outside of <br />the hoist way via a lockable fire rated access door. <br />• Provide wires, in approved conduit, from all of the elevator smoke detectors as "dry <br />contacts" to the elevator machine room, for connection to the elevator controller. <br />• Upgrade the existing fire panel to have annunciated zones for each of the added smoke <br />detectors. <br />C. CONSTRUCTION PHASE <br />a. General: <br />The Contractor will be fully responsible for all aspects of construction, which also includes <br />the following: <br />• Management of the construction activities. <br />Furnishing and installation of all equipment, materials, and labor necessary to complete <br />the project, in place, and fully operational as identified in the scope of work for Design <br />Development and Related Work. <br />City of Santa Ana RFP 13 -038 <br />Page 7 <br />23A -16 <br />