My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
23A - PROJ - MAIN LIBRARY ELEVATOR
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2013
>
11/04/2013
>
23A - PROJ - MAIN LIBRARY ELEVATOR
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/1/2013 10:22:44 AM
Creation date
10/31/2013 3:39:22 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
23A
Date
11/4/2013
Destruction Year
2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• Refurbish hall door hardware only as necessary, which shall include rollers, contacts, <br />gibs, pick -up assemblies and door closers. <br />• Provide new door clutch and restrictor <br />• Provide new infrared door detector edge. <br />• Hydraulic Power Unit <br />• Provide and install one new hydraulic submersible power unit, in its entirety, <br />consisting of, but not limited to, new valve, tank, motor and pump, <br />• Machine Room (post Installation) <br />• Clean machine room floor of dirt, oil and grease. <br />• Pain machine room floor with one coat of oil resistant paint. <br />• Apply one coast of field applied machinery enamel to machine room equipment, hoist <br />way equipment, and all exposed equipment installed as part of this specification. <br />Alternate Bid #1: Cab Interior <br />• Dismantle interior of existing elevator and prep for new finishes <br />• Install Snap cab Reflections, Modern, Classic style cab on back and sidewalls <br />• Install new style economy style ceiling inside the above one passenger elevator <br />• Install ADA compliant steel handrail <br />• Install brushed stainless steel on the car door, front return walls, header and car columns <br />• Return elevator back to service <br />Alternate Bid #2: Fire /Smoke Detectors: <br />• Install smoke detector at each elevator lobby entrance and one in the machine room <br />• Install smoke detector at top of the elevator hoist way. Provide access from the outside of <br />the hoist way via a lockable fire rated access door. <br />• Provide wires, in approved conduit, from all of the elevator smoke detectors as "dry <br />contacts" to the elevator machine room, for connection to the elevator controller. <br />• Upgrade the existing fire panel to have annunciated zones for each of the added smoke <br />detectors. <br />C. CONSTRUCTION PHASE <br />a. General: <br />The Contractor will be fully responsible for all aspects of construction, which also includes <br />the following: <br />• Management of the construction activities. <br />Furnishing and installation of all equipment, materials, and labor necessary to complete <br />the project, in place, and fully operational as identified in the scope of work for Design <br />Development and Related Work. <br />City of Santa Ana RFP 13 -038 <br />Page 7 <br />23A -16 <br />
The URL can be used to link to this page
Your browser does not support the video tag.