My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25C - AGMT - PARK LANDSCAPE SRVS
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2014
>
01/21/2014
>
25C - AGMT - PARK LANDSCAPE SRVS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/16/2014 4:45:47 PM
Creation date
1/16/2014 4:41:01 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Parks, Recreation, & Community Services
Item #
25C
Date
1/21/2014
Destruction Year
2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
78
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
7.3,6 Tamp the area firmly with steel tamp. <br />Note: The tamp will be most effective if you cover the bottom with plastic. Tape the plastic to the <br />tamp handle. The plastic keeps the clay from sticking to the tamp's bottom, <br />733.7 After tamping and compacting the "mound mix" covers areas with infield brick dust. <br />7,4 Pitcher's Mound <br />7.4.1 Follow same procedure for repair of home plate /bailers box area utilizing dry "mound mix" for this <br />purpose. Do MLcover with infield mix. <br />7.4.2 Add to the above the following: Rake all loose material from bottom to top and cover with "Mound <br />Mix ". <br />7,5 2pneral Srickdust Skinned Infield Areas <br />7.5.1 After raking/shoveling loose material from high spots back into low spots /worn areas on running <br />paths, sliding zones, and any other low spots /wom areas appearing on the field, the Contractor shall <br />fill all remaining low spots with new Gail Materials "Pro Gold with Stabilizer" brickdust from stock <br />and make level. <br />7.5.2 The contractor shall clean all excess brickdust beneath or next to the backstop, dugout chain link <br />fencing and /or infield chain link fence lines so that the infield briokdust is level with the dugout <br />pavement and pavement outside the infield. <br />7.5,3 Lightly water entire infield before dragging. <br />Note; Watering shall penetrate brickdust to a minimum depth of 1/8" deep min. This process is <br />crucial to keeping brickdust in place and not going air borne, <br />7,5.4 Drag infield utilizing small utility vehicle as specified with "grooming or finishing drag ". Circular or <br />figure eight drag patterns shall be used (see details 1 -A & l -E). Alternate drag pattcrus or reverse <br />direction of drag patterns daily to avoid ruts and high/low areas. Speed of drag procedure shall not <br />exceed 7 mph. <br />7.5.5 When dragging the skinned infield, the contractor shall stay away from all turf edges a minimum of <br />18 ". This will help in avoiding lips at brickdust/turfedges. This 18' gap shall also apply to all <br />backstops and chain link fence areas. <br />7.5.6 Contractor shall hand rake all base paths on combination turf/brickdttst infields. <br />7.5.7 When the dragging process is complete, the contractor shall stop the drag in a different location <br />daily. This will stop the accumulation of brickdust in focused areas. At this time roll -up the drag, <br />place it on the vohicle and remove all debris accumulated in the drag at this spot and rake out <br />material emptied frorr�ag. <br />7.5.8 After dragging, hand rake the 18" edges using the "grade or grooming rake ". The rake shall be held <br />at an angle as to not push brickdust onto /into huf areas. <br />7.5.9 After raking the 18" edges, the contractor shall clean all excess brickdust on the turf edges utilizing a <br />high pressure water nozzle or heavy duty broom. NO brickdust shall be permitted on the turf edges <br />at any time.lf in the determination of City staff, an unsafe lip situation exists (an unsafe lip is '' /a" or <br />greater) in any turf/brickdust border area infield to brickdust, bass -paths or brickdust to outfield), <br />contractor will be required to remove or level the soil build -up with a sod cutter and re- establish the <br />25C -28 <br />
The URL can be used to link to this page
Your browser does not support the video tag.