Laserfiche WebLink
2) New Construction <br />Where new construction or redevelopment may involve a <br />significant part of a work site, the Projects Manager or designee <br />may delete a portion of or the entire work site from contractual <br />maintenance during the construction and plant establishment <br />period. The deletion of this portion of work will be reflected as a <br />reduction in the monthly payment to the contractor. The amount <br />of reduction will be based on the percentage of area involved and <br />agreed upon by the City and the Contractor. <br />3) Inspection <br />The Projects Manager or designee shall weekly inspect the work <br />area to ensure adequacy of maintenance and that methods of <br />performing the work are in compliance with the contract. <br />However, this shall not be construed to relieve the Contractor's <br />supervisor of the duty to provide continuous inspection of the work <br />area. Contractor shall provide a dedicated supervisor to Santa <br />Ana for this contract. Discrepancies and deficiencies in the work <br />shall be corrected by the Contractor immediately. The City <br />expects a high level of service and maintenance. <br />4) New Maintenance Areas <br />Additional routine maintenance may be added to this contract. <br />Payment for add -on maintenance shall be computed on a square <br />foot cost per contract bid prices. <br />5) Arterial Sidewalk Maintenance <br />Contractor shall remove all weeds in the sidewalk and tree well <br />areas, remove sucker growth on parkway and sidewalk trees, trim <br />vines along walls so as not to allow plant material to impede <br />pedestrian traffic or grow onto sidewalk areas, and remove any <br />debris and trash weekly. Contractor shall spray a pre- emergent to <br />discourage future weed growth. Additional arterial sidewalk <br />maintenance may be added to this contract. Payment for add -on <br />maintenance shall be computed on a lineal foot cost per contract <br />bid prices. <br />6) Damage Repair <br />1. All damage incurred by the Contractor's operations shall be <br />repaired or replaced in kind and size at the Contractor's <br />expense. <br />2. Irrigation repairs shall be completed within twenty -four (24) <br />hours using approved materials. <br />3. Non - irrigation repairs shall be completed within seven (7) <br />