My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
MARIPOSA LANDSCAPES, INC. (STREET MEDIANS) - 2013
Clerk
>
Contracts / Agreements
>
M
>
MARIPOSA LANDSCAPES, INC. (STREET MEDIANS) - 2013
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/30/2014 11:09:09 AM
Creation date
1/30/2014 10:23:05 AM
Metadata
Fields
Template:
Contracts
Company Name
MARIPOSA LANDSCAPES, INC.
Contract #
A-2013-097
Agency
PUBLIC WORKS
Council Approval Date
6/17/2013
Expiration Date
6/17/2015
Destruction Year
2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
60
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
working days and shall be repaired using only pre- approved <br />materials. <br />4. Contractor shall be responsible for repair - related maintenance <br />such as, but not limited to, watering and fertilizing of replaced <br />plant materials until accepted by the Projects Manager or <br />designee. <br />7) Vandalism <br />Contractor shall be responsible for the labor to repair damaged <br />landscaping caused by vandalism or vehicle accidents with <br />material costs to be reimbursed by City. The Contractor shall <br />submit invoicing to establish cost of materials. <br />J. ANNUALS <br />1) Areas designated for annuals planting shall be rotated on a <br />triannual (three times a year) basis. <br />2) Appearance of designated areas shall be kept fresh and vigorous <br />at all times. <br />K. PENALTIES AND FINES <br />Failure to comply with specifications of contract or requests from the <br />Projects Manager or designee and /or creating unnecessary delays, as <br />determined by the Projects Manager or designee, may be cause for fines <br />and penalties in the amount of $300.00 per occurrence per day until said <br />request(s) is completed. This shall be deducted from routine monthly <br />maintenance payments. <br />Failure by Contractor to provide certain maintenance <br />functions /deliverables within the timelines called for in this specification <br />not limited to (and itemized below) will result in a penalty of $300.00 <br />(called out for in contract) for each occurrence being withheld from <br />Contractor's current monthly invoice payment. <br />1. To take immediate corrective action to landscape that is <br />stressed due to lack of water, insect and weed infestation <br />2. To provide schedules <br />3. To utilize City - supplied water meter <br />4. To perform as indicated on the work schedule <br />5. To respond to emergencies within thirty (30) minutes <br />6. To correct unsafe conditions within twenty -four (24) hours <br />
The URL can be used to link to this page
Your browser does not support the video tag.