Laserfiche WebLink
COOPERATIVE AGREEMENT NO. C -3 -2084 <br />ATTACHMENT A <br />KRAEMER BOULEVARD I GLASSELL STREET I GRAND AVENUE -- TSSP <br />3. Key components of the corridor review shall include, at minimum, the following: <br />a. Corridor lane configurations and lane widths; <br />b, Existing street and lane geometries, curbs, bus turnouts, shared use by different modes, <br />and medians; <br />c. Upcoming improvements to the corridor; <br />_.....d._.. All. - Traffic - Control - _ Devices. . related. to traffic.. signal operations at all PROJECT ... _ <br />intersections, approaches to cross streets, and along PROJECT corridor; <br />e, Traffic signal control device information, such as type of device, brand and make, <br />condition of equipment. Intersection Photographic Documentation Log shall be required; <br />f. Existing signal operation characteristics — signal phasing, cycle lengths, phase sequence <br />alteration, and protective - permissive, etc.; <br />g. Existing controller and telemetry /interconnect equipment, if any; <br />h. Existing time - referencing setup, if any; <br />I. Existing Central Master Equipment, if any; <br />j. Existing Field Master Equipment, if any; <br />k. Open each controller cabinet and take digital photos of all equipment inside; <br />I. Note any deficiencies of traffic control equipment at each intersection; and <br />m, Note the maintenance condition or existence of the traffic signal equipment, controllers <br />and synchronization related infrastructure, <br />CONSULTANT shall also investigate factors that are expected to affect signal progression <br />including, but not limited to: intersections with high pedestrian or bicyclist volumes; over - saturated <br />Intersections; uneven lane distribution; high volumes of trucks and buses; high - volume un- <br />signalized intersections, including interchanges; parking maneuvers; presence and location of bus <br />stops; differing signal timing patterns among AGENCIES; etc. <br />With the view of assisting, enhancing, and improving the traffic operations along this corridor, <br />CONSULTANT shall identify any deficiencies of the existing traffic signal control and telemetry <br />infrastructure, and geometric layout, and provide recommendations towards simple solutions that <br />may be implemented to correct such deficiencies. CONSULTANT shall prepare a report <br />summarizing the findings of the field review. <br />If deemed necessary by the APM or through request of an AGENCY through the APM, <br />CONSULTANT shall prepare any design construction documents in the form of sketches to full - <br />fledged Plans Specifications and Estimates (PS & E). CONSULTANT shall prepare such plans for <br />use in the construction of the PROJECT per each respective AGENCY's standards, <br />CONSULTANT shall supply such documentation to the APM and the AGENCY owning the affected <br />facility for approval prior to commencing any construction. Construction documents will be used <br />during the course of construction by AGENCY for inspection services. CONSULTANT shall modify <br />documents subject to approved construction completion to owning AGENCY as an As — Built <br />document. Cost for production, reproduction, inspection services, and as — built services are part of <br />the Full Fixed Price of the Contract and /or CTO and no additional compensation shall be allowed, <br />therefore, <br />CONSULTANT will be required to design, procure, install, construct, and implement all desired <br />components of the PROJECT as described in this document. CONSULTANT shall negotiate with <br />OCTA and AGENCIES at the beginning of PROJECT to determine what actually shall be installed <br />and implemented to maintain budgetary control. <br />Ptgt�24 <br />