My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25E - AGMT - GRAND TRAFFIC SIGNAL SYNC PROJECT
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2014
>
02/04/2014
>
25E - AGMT - GRAND TRAFFIC SIGNAL SYNC PROJECT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/2/2014 7:53:16 AM
Creation date
1/30/2014 4:03:19 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
25E
Date
2/4/2014
Destruction Year
2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
50
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
COOPERATIVE AGREEMENT NO, C -3 -2084 <br />KRAEMER BOULEVARD /GLASSELL STREET/ GRAND AVENUE RTS8P <br />1 F. To prepare a "Before and After Study" for the PROJECT as described in the Measure M2 <br />2 Eligibility Guidelines adopted by the AUTHORITY. The "Before and After Study" for the project is <br />3 considered the equivalent of the required Project Final Report (Measure M2 Ordinance No, 3, Section <br />...... _._ ... <br />4 8.111.9) for the PROJECT. The AUTHORITY shall provide the 'Before and After Study" to the <br />5 PARTICIPATING AGENCIES in draft and final formats for review and comment, AGENCY comments <br />6 shall be noted In the final study. If specified in original PROJECT APPLICATION, the AUTHORITY shall <br />7 provide a "Before and After Study" video of a representative portion of PROJECT, <br />8 G. To provide Ongoing Monitoring and Maintenance of optimized signal timing after Primary <br />9 Implementation of the PROJECT is completed and continue until the end of the three year grant period, <br />10 ARTICLE 5. RESPONSIBILITIES OF THE PARTICIPATING AGENCIES <br />11 The PARTICIPATING AGENCIES agree to the following responsibilities for implementation and <br />12 funding of the PROJECT: <br />13 A. Provide a technical representative to meet and participate as a member of the <br />14 PROJECT's Traffic Forum. <br />15 B. To authorize the AUTHORITY to manage, procure, and implement all aspects of the <br />16 PROJECT.. <br />17 C, To participate and support the PROJECT implementation within the timeframe outlined <br />18 in the APPLICATION and consistent with the CTFP Guidelines adopted by the AUTHORITY, <br />19 D. To provide the AUTHORITY all current intersection, local field master, and or central <br />20 control system timing plans and related data upon request. <br />21 E. To provide the local cash match and or documentation for the in -kind services match for <br />22 the PROJECT in accordance with Attachment B. Failure to provide included local cash match and or <br />23 evidence of in -kind services match may result in the loss Of future participation for competitive funding <br />24 opportunities <br />25 F. PARTICIPATING AGENCIES that have included a dollar match as identified in <br />26 Attachment B shall provide payment for the dollar match to the AUTHORITY within 30 calendar days of <br />Ppg5E '46 <br />
The URL can be used to link to this page
Your browser does not support the video tag.