Laserfiche WebLink
978Q. Dally Appellate Report Monday, Iuly:29i'.43� <br />project life (rather than as a permanent structure, w <br />will increase annual winter juvenile% chid <br />as muter the proposed project)," and eliminated s <br />survivability in the project yici*.." •"" s <br />the need for ongoing maintenance of the weir and " <br />"floodplain benching' was inwiltoi•dted,ln'td' the <br />- i <br />fuseplug,'the Drandetermined that "stranding or D <br />Draft, along with mitigation measured for its <br />entrapment ofspeciat- sta tussalmonida would be i <br />impact onsalmoWds and riparian habitat <br />a potentially sigrilflcant hnpaet if the Projectwere I <br />In its comments on the Draft SCS Engineers - <br />constructed wlththeweir fuse plug; However, f <br />for Masonito criticized the floodplain benching. F <br />ntigation measures that included salmond S <br />SCS wrote;. "Artificial and unwarranted <br />rescue and relocation programs Implemented in ' <br />'improvements' such as those pprotosed by, <br />consultation with NMFS and the Department of G <br />Granite serve to upset the b' litliduirl'iof trig` <br />Fish and Game (Fish & Gaine), would make this f <br />fluvial s <br />system for the financial beQefit `�o# •one <br />impact "[1jessthan significant" TlieDraftfurther l <br />landowner, T <br />Ttils proposed at 'do , is <br />stated that if Alternative 9 was implemented, it n <br />not only unneeded under`current'hcbuditious" <br />would " <br />such channel manipulations have'the,'patent12; <br />capture and sabnonld entrapment" and "eliminate t <br />to destabilize downstream banks and to'shift'the� <br />the need for the rescue. plan:" - p <br />position of the channet thalweg vdtli potentially: <br />.In November A,. 2009, comments on the n <br />negativeimpactstodownstreamlanddwners 'Stich; <br />Draft, NMFS expressed concern that when pit n <br />negative impacts may include mcrea9edtoteq"dalI - <br />ininhhg operations resulted in ponds of standing f <br />for flooding or other unanticipated " <br />groundwater more than 35 feet deep, sonar obic r <br />response's that may occur : as7 a 'result of'f de ' <br />conditions would threaten the vitallty'of any p <br />proposed unwarranted mechanical maid elation' <br />salmonhds trapped in the ponds, mid the depths of o <br />of tine channel.... (I] ... ITlhere is tittle ' <br />the reclaimed ponds would need to b <br />no geomorphic or other sclemiHc justi t <br />The County determined in the EIR that T <br />The Mendocino County Neater' Agency' also <br />- <br />Alternative 3 was "environmentally superior" to e <br />expressed concerns that erosion would decor in <br />the weir and fuse plug, aril the NMFS supported t <br />the floodplain bench area. in response to these• <br />Alternative 3 in comments "submitted prior to c <br />comments, Alternative 3 was rovised in theTIR' <br />PI m C r <br />ann g at as on approva e, a e <br />approved, die Project included the pond -river The EIR sls <br />connection in lieu of the weir and fuse plug . benching "t <br />reflected intherevisedreclamaticuptan appended relative toil <br />to the EIR. I After cic <br />Although the Draft stated that the pond -. on the Di <br />river connection would' et ati ate the need for - Conservatic <br />a salmonid rescue program, the EIR retained a letter'to <br />a rescue program during the mining phase of benching -v <br />die Project. The Draft set forth two options for moatrecert <br />the reclamation phase. Option A provided for Departmen <br />construction of the pond- river - connection unless that floodpl <br />NMFS and great benel <br />Fish & Game staff determined tlhat the "potential along the ai <br />adverse quality within the pit" would floodcoatr+ <br />t twelgh the connection's expected 'benefits floodplain t <br />to salmonid habitat. optic, B required Granite the reclaim <br />to continue the salmonid rescue program until for removk <br />construction of the pond-river connection, Tlie benefir " ant <br />' deference to NMFS and Fish & Game concerns potential envi <br />' over water quality In the pit was replaced in the Countysta <br />EIR by more detailed mitigation regWrements, was "not de <br />sot forth ffi newmidgadon measure 3AA-AET 3, mitigation fei <br />to address concerns raised InNMFS'sNovember the issue as a <br />20(191otter.9 oe"> ficatly,theElRstatedthntGranite "m'" of the <br />won" limit the depth''a the reclaimed ponds to iDrahj - regm <br />35 feet list <br />stated would be acceptable, ar habitats woul <br />} deeper if acceptable pursuant to a future . waits the'floodplah <br />qualilyassrssmenta since the on <br />benching we <br />(b) Floodplain Benching position and I <br />' to - determim <br />'rhe term "loodplam benching" refers to a benching in <br />proposal by Grimd.e in'the Project,applleation, Commisslon <br />' to widen the Ackerman Creek and Russian &Game had <br />�;. River channels to hnprave channel hydraulic would adver <br />capacity and winter resting habitat for salmoWds habitat of the <br />above what is curre»�Iyavailable which, in turn, discussing th <br />{ <br />no <br />was <br />nme <br />that <br />to <br />whether' to' ri <br />the Project <br />neeting, staff a <br />micerns that flo <br />=ly affect water <br />Frog. After uddt <br />matter, Uie'Plan <br />75A -6 <br />ever;, r <br />plain: ' <br />3sloq <br />plain <br />nog,> <br />Fish <br />Ifm i i <br />'flit t <br />addh = <br />asnono a <br />construction of the pond-river connection, Tlie benefir " ant <br />' deference to NMFS and Fish & Game concerns potential envi <br />' over water quality In the pit was replaced in the Countysta <br />EIR by more detailed mitigation regWrements, was "not de <br />sot forth ffi newmidgadon measure 3AA-AET 3, mitigation fei <br />to address concerns raised InNMFS'sNovember the issue as a <br />20(191otter.9 oe"> ficatly,theElRstatedthntGranite "m'" of the <br />won" limit the depth''a the reclaimed ponds to iDrahj - regm <br />35 feet list <br />stated would be acceptable, ar habitats woul <br />} deeper if acceptable pursuant to a future . waits the'floodplah <br />qualilyassrssmenta since the on <br />benching we <br />(b) Floodplain Benching position and I <br />' to - determim <br />'rhe term "loodplam benching" refers to a benching in <br />proposal by Grimd.e in'the Project,applleation, Commisslon <br />' to widen the Ackerman Creek and Russian &Game had <br />�;. River channels to hnprave channel hydraulic would adver <br />capacity and winter resting habitat for salmoWds habitat of the <br />above what is curre»�Iyavailable which, in turn, discussing th <br />{ <br />no <br />was <br />nme <br />that <br />to <br />whether' to' ri <br />the Project <br />neeting, staff a <br />micerns that flo <br />=ly affect water <br />Frog. After uddt <br />matter, Uie'Plan <br />75A -6 <br />ever;, r <br />plain: ' <br />3sloq <br />plain <br />nog,> <br />Fish <br />Ifm i i <br />'flit t <br />addh = <br />asnono a <br />no <br />was <br />nme <br />that <br />to <br />whether' to' ri <br />the Project <br />neeting, staff a <br />micerns that flo <br />=ly affect water <br />Frog. After uddt <br />matter, Uie'Plan <br />75A -6 <br />ever;, r <br />plain: ' <br />3sloq <br />plain <br />nog,> <br />Fish <br />Ifm i i <br />'flit t <br />addh = <br />asnono a <br />