Laserfiche WebLink
G, Attend meetings with City's staff as required, <br />Map Checking Services <br />H. (/formation furnished by the City will be roughly as follows: 1set of Exhibits, title <br />reports, reference documents (Deed, Parcel Map, Tract Map, etc.), traverse closures, and <br />improvement plans. <br />|. Review Exhibits for technical correctness and completeness, consistency with the City <br />guidelines and requirements, compliance with the Subdivision Map Act, and acceptance for <br />J, Review title report and existing easements for correct plotting and references. <br />K. Review improvement plans associated with Ilie project to ensure the Exhibits correctly <br />identify the limits and location au shown *m the improvement plans. <br />L Provide a set mf redline check prints showing the nndiinod comments, and required <br />corrections and information, <br />M. Provide a check letter covering the major required comments, and corrections and instruction <br />for future submittals. <br />K Provide admembwet with items L. and 0Y. above a& the end cfevery review. The tinuwshowt <br />must include, but isnot limited to, project name, review number, dates, review hours, hourly <br />rate, and total cost. <br />(J, Provide survey services mm requested, Adetailed nf work will b outlined when <br />specific project is assigned to the consultant- Services shall include, but are not limited to, <br />cross-sections, intersection gilids, centedine determination, digital terrain models (Alm), right <br />of way determination, utility profiles and exhibits. <br />P' Generate a computer dnwwing inMimnatabmnVB format showing survey per the attached City <br />of Santa Ana CADD Standards (Attachment B) as well as the sample survey drawing on the <br />City of Santa Ana wmbsita listed m item @below: <br />0. All survey needs to be prepared to the satisfaction of the CiVs Senior Surveyor and meet the <br />following standards: <br />R. Horizontal control shall bo based onthe U983h|wrth American Datum (NAD83 bed toa <br />minimum of two proximate County of Orange, CCS8J, Zone \/1,1991-5S Epoch Adjustment <br />control points. Project coordinate values shall 6e provided imU,G, Survey Feet, The County <br />control points shall determine the Basis uf Bearing for the project <br />S. Vertical control shot be based mn the North American Vertical Datum mf1983(MAyD88),tied <br />k>u minimum ef two proximate Cowmtyo# Orange bench marks- Project elevations shall bo <br />provide inU.S. Survey FaoL <br />T- Horizontal alignment(s) for the project shall be tied to the survey centerline monuments within <br />the project area, <br />������ <br />������� <br />