My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CIT COM INC. 2A -2013
Clerk
>
Contracts / Agreements
>
C
>
CIT COM INC. 2A -2013
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/28/2014 9:43:00 AM
Creation date
4/28/2014 12:03:27 PM
Metadata
Fields
Template:
Contracts
Company Name
CIT COM INC.
Contract #
A-2013-174
Agency
POLICE
Council Approval Date
11/18/2013
Insurance Exp Date
9/15/2015
Destruction Year
0
Notes
N-2012-089
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
37
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4. Vendor Response Forms (including the evaluation and selection approach) <br />S. Functional Specifications <br />Cit Corn was a primary author of the Law Enforcement Information Technology Standards Council's <br />(LEPTSC) national CAD and RMS functional standards. Therefore, we possess the "source" material <br />from which those documents were crafted, and provide our clients with detailed (technical and <br />functional) requirements in a succinct medltnn for use in RFP documents. <br />The SAPD RFP documentation would fully describe the criteria to be used In evaluating the <br />proposals as well as set forth the plan to be followed In conducting the evaluation. Cit Cone would <br />make recommendations for the most appropriate method for evaluating the responses. The RFP <br />would be submitted in draft form to project team members for review and amendment. Following <br />Steering Committee approval, a final copy would be delivered to the City for release. Cit Com <br />would release the RFP to a list of qualified vendors (prepared cooperatively with SAPD), as well as <br />to any vendor responding to the open bid (in concurrence with city requirements). A pre proposal <br />conference would be conducted for prospective vendors, addressing questions and issues and Cit <br />Com would be In attendance. <br />Specific deliverables of this task would Include: <br />— Draft and Final Specification Documents <br />— Draft and Final SAPD RFP <br />Task 1 -4 Procurewent Support. <br />Cit Core, acting as a member of the evaluation team, would review each proposal response to <br />determine which systems are best able to meet the requirements. Each proposal would also be <br />reviewed by members of the project team for completeness and to ensure that they properly address <br />the functionality requirements of the RFP. During this portion of the project, the evaluation and <br />selection criteria methodology would be applied, thus eliminating vendors who fail to meet the <br />requirements. Using the evaluation criteria as a guide, qualified proposals would be evaluated in <br />depth based upon (at a minimum) the following criteria: <br />• Adherence of the proposal to die format. <br />• Completeness of the proposal. <br />• Quality and depth of references. <br />• Previously demonstrated ability to successfully install police technology applications. <br />• Level of service and responsiveness that the vendor commits to providing to the City. <br />• Financial stability and resources of the vendor. <br />• Experience and technical expertise of stall', <br />• Design, capability, and functionality of system and application software as determined by $ <br />the evaluation team. n. <br />• Current availability and ability to demonstrate installation of the proposed software <br />applications required by the City, <br />G <br />U <br />
The URL can be used to link to this page
Your browser does not support the video tag.