My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
HDR ENGINEERING, INC. 2 - 2014
Clerk
>
Contracts / Agreements
>
_PENDING FOLDER
>
READY TO DESTROY IN 2020
>
HDR ENGINEERING, INC. 2 - 2014
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/28/2017 10:46:04 AM
Creation date
6/17/2014 10:51:18 AM
Metadata
Fields
Template:
Contracts
Company Name
HDR ENGINEERING, INC.
Contract #
A-2014-041
Agency
PUBLIC WORKS
Council Approval Date
2/4/2014
Expiration Date
6/30/2015
Insurance Exp Date
6/1/2016
Destruction Year
2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
61
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Each building structure under management will require an asbestos survey and lead based paint testing, which will <br />be performed by HDR RES' subcontractors. A remediation and removal plan, following all local, state, and federal <br />regulations, will be prepared. Additional hazardous materials testing and removal will be performed as needed. At <br />the appropriate time and in the appropriate manner, HDR RES will coordinate the demolition and clearance of all <br />improvements. Typical property management services include: <br />• Prepare and maintain property inventory report; <br />• Prepare lease agreements and monthly rent collection and receivables aging report; <br />• Coordinate utility service transfers, payments, and disconnections; <br />• Inspect, monitor, and maintain secure and decent living conditions; <br />• Monitor tenant move -out; <br />• Fence and board up properties when vacated; <br />• Coordinate all hazardous material testing and removal; <br />• Coordinate demolition and clearance; and <br />• When excess property is available, prepare marketing and disposal plan. <br />• Request title commitments for each of the parcels identified for acquisition, showing listed exceptions and <br />encumbrances; <br />• Review title and prepare a report for each parcel recommending which exceptions should be retained and <br />which cleared; and <br />• Prepare signature ready legal documents to convey the necessary interests required from each parcel. <br />Closing and Conveyance — HDR RES Staff <br />• Clear any liens and encumbrances in conflict with the City's intended use of the right of way acquired to <br />ensure certification and that there are no conflicts of ownership or use of the land required during <br />construction; <br />• Prepare escrow instructions and invoice for the costs associated with an escrow closing, if an escrow closing <br />is required; and <br />• Include in transmittal packages conveyance documents ready for the City to record and vouchers to be <br />processed for payment. <br />• HDR RES will provide all necessary litigation support required by the City. HDR RES staff has the necessary <br />experience in verifying and updating title information, furnishing and confirming the names and addresses <br />of all parties having an interest in a property to ensure appropriate individuals are served, and completing <br />and presenting suit information forms according to the City's preferences. We will assist the City's Counsel in <br />attending legal proceedings, answering interrogatories and requests for production, and will seek their <br />guidance to ensure proper suit preparation and submission. <br />Certification — Michael Williams and Senior HDR RES Staff <br />• Provide certification preparation, review and advisory services. <br />Other Right of Way Support— HDR RES Staff <br />• Assist in securing and managing construction subcontractor to perform curative work as required; and <br />• Provide security and property management assistance, including patrolling, fencing and boarding -up of <br />various City properties. <br />18 <br />
The URL can be used to link to this page
Your browser does not support the video tag.