Laserfiche WebLink
G. Attend meetings with City's sniff as required'. <br />Mara Checking Services <br />H. Information furnished by the City for checking will be roughly as follows: 1 set of Exhibits., title <br />reports, reference documents (Deed, Parcel Map, Tract Map, etc-), traverse closures, and <br />improvement plans. <br />I. Review Exhibits for technical correctness and completeness, consistency with the City <br />guidelines and requirements, compliance with the Subdivision Map Act, and acceptance for <br />recording. <br />J. Review title report and existing easements for correct plotting and references. <br />K. Review improvement plans associated with the project to ensure the Exhibits correctly <br />identify the limits and location as shown on the improvement plans. <br />L. Provide a set of redline check prints showing the redlined comments, and required <br />corrections and information. <br />M. Provide a check Netter covering the major required comments, and corrections and instruction <br />for future submittals. <br />N. Provide a timesheet with items L. and M_ above at the end of every review. The timesheet <br />must include, but is not limited to, project name, review number, dates, review hours, hourly <br />rate, and total cost.. <br />Miscellaneous Services <br />Oa Provide survey services as requested. A detailed scope of work will be outlined when <br />specific project is assigned to the consultant. Services shall includeā€˛ but are not limited to, <br />cross - sections, intersection grids, centerline determination, digital terrain models (.dtm), right <br />of way determination, utility profiles and exhibits. <br />P. Generate a computer drawing in Microstation V8 format showing survey per the attached City <br />of Santa Ana CARD Standards (Attachment B) as well as the sample survey drawing on the <br />City of SanL Ana website listed in item 4 below: <br />Q_ All survey needs to be prepared to the satisfaction of the City's Senior Surveyor and meet the <br />following standards: <br />R. Horizontal control shall be based on the 198:3 North American Datum (NAD83), tied to a <br />minimum of two proximate County of Change, CCS83, Zone VI, 1991.35 Epoch Adjustment <br />control points. Project coordinate values shall be provided in U.S. Survey Feet. The County <br />control points shall determine the Basis of Searing for the project. <br />S_ Vertical control shall be based on the North American Vertical datum of 1988 (;NAVD88), tied <br />to a minimum of two proximate County of Change bench marks. Project elevations shall be <br />provide in U.S. Survey Feet. <br />T. Horizontal alignments) for the project shall be tied to the survey centerline monuments within <br />the project area. <br />