My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25I - AGMT - CIP DEMO SRVS
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2014
>
08/05/2014
>
25I - AGMT - CIP DEMO SRVS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/31/2014 3:50:28 PM
Creation date
7/31/2014 2:11:44 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
25I
Date
8/5/2014
Destruction Year
2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
84
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Santa Ana <br />On -Call Demolition Services RFP No.: 14 -026 <br />May 27, 2014 <br />Commercial Properties Demolition, Bristol Street Widening, 1211 W. Warner Ave & 2235 South <br />Bristol St, Santa Ana <br />Year: 2011 <br />Project included demolition and removal of two commercial buildings, a former auto shop and liquor <br />store, Asbestos abatement was included in scope of work as well as sewer capping, grading of site to <br />drain and pumping of hazardous liquids. All work was completed within the time frame, in budget and <br />with no incidents, Eric Cain and Mauro Ruiz were supervisors on this project Tri Span performed the <br />asbestos abatement. <br />Completed: September 2011 <br />Contract Value, $59,500.00 <br />Contact: Jason Gabriel, Senior Civil Engineer 714. 647.5654 <br />City of Santa Ana <br />20 Civic Center Plaza, Santa Ana, CA 92703 <br />Commercial Building Demolition, Bristol Street Widening, 1631 N. Bristol St, Santa Ana <br />Year: 2013 <br />Scope of work included demolition of a (3) story commercial building that included slabs and footings <br />removal as well as an elevator. Asbestos abatement was Included In the scope of work as well as sewer <br />capping, pumping of all hazardous fluids, grading site to drain and site clearance All work was performed <br />within the time frame and budget with no occurrences. Eric Cain and Mauro Ruiz were supervisors on this <br />project <br />Completed: March 2013 <br />Contract Value $309,50000 <br />Contact: Jason Gabriel, Sr Civil Eng. 714 -647 -5664 <br />City of Santa Ana <br />20 Civic Center Plaza, Santa Ana, CA 92703 <br />Commercial Property Demolition, 1221 East 1 atStreet, Santa Ana <br />Year: 2013 <br />Scope of work included demolition and asbestos abatement of a 12,000 sq.ft. commercial building. <br />Work included removal of slabs and footings, sewer capping, leave site to drain and site clearance. Eric <br />Cain and Mauro Ruiz were supervisors on this project and all work was performed according to <br />schedule and budget, <br />Completed: <br />Contract Value, <br />Contact: <br />J &G Industries <br />September 2013 <br />$74,00000 <br />Jason Gabriel, Sr Civil Eng, 714 - 647 -5664 <br />251 -62 <br />Page 13 <br />
The URL can be used to link to this page
Your browser does not support the video tag.