Laserfiche WebLink
If the SAPRF representative requests or directs the Contractor to perform work in a given area, it will be <br />the Contractor's responsibility to verify and locate any underground systems (i.e. utility lanes) and take <br />responsibility for taking reasonable precaution when working in these areas. <br />Contractor shall call Underground Alert (800) 422 -4133) at least two working days prior to digging for <br />line locations. Any damage or problems shall be reported immediately to the SAPRF representative and <br />the City of Santa Ana. If the Contractor discovers something unexpected or a unique problem occurs, he <br />should stop work and immediately contact an authorized SAPRF representative for a timely resolution <br />of the problem. <br />2.05 CONTRACTOR'S STAFF <br />The Contractor shall provide sufficient personnel to perform all work in accordance with the <br />specifications set forth herein. A qualified, English speaking supervisor in the employ of the Contractor <br />shall supervise all of the Contractor's personnel. The supervisor shall be available at all times to the <br />SAPRF representative during work operations. The responsibility for all work performed will remain <br />with the full -time certified arborist. <br />The Contractor shall famish the necessary competent and key personnel to properly supervise and direct <br />the work of fully equipped, competent and experienced crews as well as all safety equipment, including <br />but not limited to, all equipment and work procedures required by ANSI Z133.1 -1994. The Contractor <br />shall secure all timekeeping, bookkeeping and other necessary clerical and office work required in the <br />performance of the contract. <br />The Contractor shall be responsible for the supervision of all of his crews. He shall check all of his <br />crews regularly for proper quantity and quality of work, proper maintenance of tools and equipment, and <br />safety. <br />The City reserves the right to remove any of the Contractor's staff deemed undesirable without cause. <br />Should a staff member be removed the Contractor shall immediately assign a replacement. <br />2.06 SUBSTITUTIONS <br />Whenever a specific type of material is specified, no substitutions shall be allowed without written <br />consent of the SAPRF representative. <br />2.07 CERTIFICATION OF MATERIALS <br />All materials shall be delivered on the site in original containers. Materials shall be subject to inspection <br />by the ARMD representative. The SAPRF representative will not approve materials not meeting the <br />SAPRF standards, and Contractor shall return any such non- satisfactory items at his/her cost. <br />2.08 CONTRACTOR NEGLECT <br />Any damage to the City of Santa Ana, SAPRF, or private property, which has been determined to be due <br />to the Contractor's neglect, shall be corrected at no additional cost to the City of Santa Ana or the <br />SAPRF. <br />2.09 HOURS OF OPERATION <br />The Contractor shall perform all work between the hours of 7:00 a.m. and 4:00 pan., Monday through <br />Friday. No work shall be performed on weekends or on City recognized holidays without written <br />SAPRF approval. <br />Districts 1, 4 and 5 Park Landscape RFP <br />1 9E -Eua5 <br />